54 Crown Street, Brooklyn
Apartment building · 569 units · built 2024 · Block 1190, Lot 29.
Building permits
- Alteration, filed Jun 20, 2024, estimated cost $10K, described as “Spyder crane placement. This application involves no change in use, occupancy or egress.”
- Alteration, filed Apr 26, 2024
- Alteration, filed Apr 15, 2024, described as “Installation of temporary stair tower as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 13, 2024, described as “Installation of two point suspended scaffold to be in accordance with nycc chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Nov 14, 2023, estimated cost $1K, described as “Installation of ez scale scaffolding in accordance with nycc chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Oct 27, 2023, estimated cost $5K, described as “Use of material platform at 54 crown street during new building construction, filed separately under 321593986”
- Alteration, filed Oct 24, 2023, estimated cost $50K, described as “Installation of emergency power generator, as shown on plans. No change in use, occupancy or egress. In conjunction with NB #321593986”
- Alteration, filed Oct 20, 2023, estimated cost $6K, described as “Installation of temporary personnel material hoist as per plans. No change in use, egress or occupancy”
- Alteration, filed Oct 10, 2023, estimated cost $3K, described as “Installation of three (3) new boilers in cellar, as shown on plans. No change in use, occupancy or egress. In conjunction with NB #321593986”
- Alteration, filed Oct 9, 2023, estimated cost $5K, described as “Use of placing boom at 54 crown street during new building construction, filed separately under 321593986”
- Alteration, filed Oct 2, 2023, estimated cost $6K, described as “Installation of temporary personnel material hoist as per plans. No change in use, egress oroccupancy.”
- Alteration, filed Sep 5, 2023, estimated cost $4K, described as “Installation of temporary roof protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 5, 2023, estimated cost $4K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 11, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 10, 2023, estimated cost $4K, described as “Installation of temporary barricade as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 10, 2023, described as “Installation of temporary plywood fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 30, 2023, estimated cost $4.5M, described as “Complete new combination of Standpipe/Sprinkler System, Related piping, and accessories as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Feb 10, 2023, estimated cost $15K, described as “Installation of plywood fence as per drawings. Plywood fence shall comply with chapter #33 of the NYCBC. No change in use, occupancy or egress under this application.”
- Alteration, filed Nov 8, 2022, estimated cost $100K, described as “Plumbing work for below cellar slab piping only as shown on plans. No change in use, occupancy or egress.”
- Alteration, filed Apr 14, 2022, estimated cost $20K, described as “Limited foundation work (421A footing installation), as shown on plans.”
- Alteration, filed Oct 15, 2020, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Fence to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Dec 27, 2019, estimated cost $29K, described as “Installation of construction fence as per plans for new building construction. No change in use occupancy or egress under this application. Construction fence shall compy with chapter 33 of the 2014 NYC building code.”
- Alteration, filed Nov 13, 2019, estimated cost $1K, described as “Proposed: installation of temporary standpipe system in conjunction with the NB #321593986. No change of use, occupancy or egress.”
- Alteration, filed Aug 1, 2019, estimated cost $1K, described as “Filing Curb Cut in association with NB # 321593986”
Property taxes
- Assessment
- $71,297,100
- 2026–27 tax
- $33,286
- Market value (city estimate)
- $158,438,000
- Taxable value
- $267,596
- Assessed land
- $2,435,850
- Assessed improvements
- $68,861,250
Tax breaks
- 421-a exemption, through Jun 30, 2060, about $8,835,360 a year below the full tax.
Zoning
R8X: floor area ratio 9.20 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 24, 2018: $41,025,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Franklin Avenue Rezoning (City Planning 2018K0356): Completed, filed Apr 18, 2018, decided Dec 27, 2018. This is a private application by CP VI Crown Heights, LLC requesting a zoning map amendment (ZM) and a zoning text amendment (ZR) to Appendix F (MIH) of the zoning resolution to facilitate two new 16-story buildings collectively consisting…
- 1451 Franklin Avenue Rezoning (City Planning P2015K0057): Completed, decided Apr 19, 2017. This is a private application by Cornell Realty Management LLC for a zoning map amendment and a zoning text amendment to facilitate the development of 514,694 square feet of residential floor area (518 units of housing, including 140…
In the news
Loden Wraps Up Construction at 54 Crown Street, 131 Montgomery Street in Crown Heights, Brooklyn, New York YIMBY, Mar 10, 2025.