# 1638 Bedford Avenue, Brooklyn

College · built 2007 · Block 1287, Lot 48.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/3012870048/1638-bedford-avenue

More construction in Crown Heights: https://umarelli.org/nyc/brooklyn/crown-heights.md

Every lot on block 1287: https://umarelli.org/nyc/brooklyn/1287.md

## Building permits

- Alteration, filed Apr 10, 2025, estimated cost $140K, described as “Installation of fuel oil day tank in bas at cuny medgar evers college.”
- Alteration, filed Nov 1, 2022, estimated cost $1.4M, described as “Proposed replacement of existing Computer Room Air Conditionings (CRAC) units serving Academic Building 1, of the following CRAC Units:CRAC-6, CRAC-7,CRAC-8,ACC-3.. All as per Plans filed herewith. No change in use, egress, or Occupancy.”
- Alteration, filed Oct 31, 2022, estimated cost $31K, described as “Proposed Structural scope to replace and repair damaged tiles and substrate structure of existing raised floor system at sever room B43 caused by the removal of 3-existing CRAC units. All as per Plans filed herewith.”
- Alteration, filed Oct 31, 2022, estimated cost $1.8M, described as “Proposed Architectural General Construction scope to replace and repair damaged tiles and substrate structure of existing raised floor system at sever room B43 caused by the removal of 3-existing CRAC units. All as per Plans filed herewith.”
- Alteration, filed Sep 26, 2022, estimated cost $300K, described as “Construction work including installation of partitions on 01-05 floors, on the penthouse level, and the roof as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Sep 23, 2022, estimated cost $200K, described as “Mechanical modification, ductwork, removal of fuel oil piping as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Sep 23, 2022, estimated cost $1.0M, described as “Domestic piping and water heaters installation as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Sep 21, 2022, estimated cost $150K, described as “Structural framing on the roof as per plans filed herewith. No change to use, egress, or occupancy.”

## Building history

- Demolition, filed Apr 15, 2004, signed off Feb 20, 2007, stories 1 to 0
- New Building — Non-residential, filed Feb 24, 2004, signed off Nov 10, 2011, 5 stories

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $14,110,650
- Market value (city estimate): $31,357,000
- Taxable value: $0
- Assessed land: $707,400
- Assessed improvements: $13,403,250

## Zoning

R6: floor area ratio 4.38 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- CROWN STREET (City Planning P2009K0034): Completed, decided Oct 12, 2011. DEMAP A 1 BLOCK SEGMENT OF CROWN ST TO CREATE A MEDGAR EVERS\*COLLEGE CAMPUS COMMON AREA

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology