902 Nostrand Avenue, Brooklyn
College · built c. 1908 · Block 1289, Lot 25.
Building permits
- New Building — Non-residential, filed Nov 2, 2022, estimated cost $16.6M, 5 stories, described as “New building for a proposed high school.”
- New Building — Non-residential, filed Nov 2, 2022, estimated cost $3.8M, 5 stories, described as “New building for a proposed cuny school.”
- Alteration, filed Jun 16, 2026, estimated cost $10K, described as “Installation of temporary construction fence”
- Alteration, filed Jan 23, 2026, estimated cost $3K, described as “Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jan 20, 2026, estimated cost $150K, described as “Installation of structural work for emergency generator. See plans for detail. No change of use, egress or occuapncy under this application”
- Alteration, filed Jan 20, 2026, estimated cost $1.5M, described as “Installation of emergency generator with related mechanical equipment. Removal of abandoned boiler equipment. No change of use, egress or occupancy”
- Alteration, filed Oct 1, 2025, estimated cost $781K, described as “Medgar Evers College, Carroll St Bldg, Exterior Parking Lot Sinkhole Repairs: Partial removal & replacement of parking lot concrete slab and asphalt. Excavation and disposal of 5' of soil below slab and replacement with new compacted…”
- Alteration, filed Jul 9, 2025, estimated cost $17.7M, described as “Herewith filing Temporary Construction Fence.”
- Alteration, filed Jun 30, 2025, estimated cost $15K, described as “Installation of temporary shoring in the cellar boiler and new pump rooms. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- No Work, filed Sep 4, 2024
- No Work, filed Apr 16, 2024
- No Work, filed Apr 16, 2024
- Alteration, filed Nov 4, 2022, estimated cost $1.2M, described as “Alterations to existing plumbing system and storm systems in conjunction with athletic center conversation and ADA upgrades for Medgar Evers College”
- Alteration, filed Nov 4, 2022, estimated cost $8.0M, described as “General Construction work for Medgar Evers College”
- Alteration, filed Nov 4, 2022, estimated cost $7.9M, described as “Paa filed to correct floor designation from cellar to basement as shown on approved plans.”
- Alteration, filed Nov 4, 2022, estimated cost $1.7M, described as “Mechanical work for Medgar Evers College in conjunction with Alt-CO”
- Alteration, filed Nov 4, 2022, estimated cost $150K, described as “Relocation of exiting sprinkler heads and installation of new heads including new floor control valve assembly. In conjunction with athletic center conversation and ADA upgrades for Medgar Evers College”
- Alteration, filed Nov 3, 2022, estimated cost $14.1M, described as “Structural and foundation work with in conjunction with NB application# B08025694-I1.”
- Alteration, filed Nov 3, 2022, estimated cost $16.4M, described as “Structural and foundation work in conjunction with NB application B08025690-I1.”
- Alteration, filed Oct 31, 2022, estimated cost $273K, described as “Proposed architectural scope of work of medgar evers college phase 2- (ahu) air handling replacement of existing windows, windows frames, repair interior elements.”
- Alteration, filed Oct 25, 2022, estimated cost $159K, described as “Proposed architectural scope of work of medgar evers college phase 2- electrical distribution upgrade- to repair existing electrical room”
- Alteration, filed Jun 16, 2022, estimated cost $50K, described as “CARROLL ST. BLDG- Installation of 2 new condensing units along with replacement of compressor, filters, coils, piping, etc. Along with correspondent Electrical work.”
- Alteration, filed Jun 15, 2022, estimated cost $23K, described as “Grading and fill associated with removal of temporary classroom units. No change in use, egress, or occupancy.”
- Alteration, filed Jun 10, 2022, estimated cost $27K, described as “Excavation associated with removal of temporary classroom units. No change in use, egress, or occupancy.”
- Alteration, filed Apr 20, 2022, estimated cost $5K, described as “Installation of temporary construction fence at 1150 carroll street, brooklyn as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
7 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $11,590,650
- Market value (city estimate)
- $25,757,000
- Taxable value
- $0
- Assessed land
- $1,944,450
- Assessed improvements
- $9,646,200
Zoning
R6: floor area ratio 0.80 built, 2.43 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.