# 975 Nostrand Avenue, Brooklyn

Apartment building · 266 units · built 2023 · Block 1309, Lot 6.

On Umarelli: https://umarelli.org/nyc/3013090006/975-nostrand-avenue

More construction in Crown Heights: https://umarelli.org/nyc/brooklyn/crown-heights.md

## Building permits

- New Building — Large Residential, filed Nov 12, 2021, 328 units, 9 stories, described as “New 9 Story non-combustible mixed-use bldg containing 328 dwelling units w/commercial & community facility on 1st floor, herewith 1 zoning lot, 1 tax lot.”
- Alteration, filed Aug 21, 2025, estimated cost $1K, described as “This application filed herewith for a temporary use permit for a salesoffice on the 1ST floor, model apartments on the 3RD floor & amenityspace on the roof pursuant to section ac 28-111 and buildings BULLETIN2010-002. No change in…”
- Alteration, filed Jan 21, 2025, described as “Installation of temporary suspended scaffold equipment.”
- Alteration, filed Jul 22, 2024, estimated cost $385K, described as “Installation of solar panels on existing roof structure. No change in use, egress, or occupancy.”
- Alteration, filed May 3, 2024, estimated cost $1K, described as “Installation and maintenance of temporary construction office in accordance with BC3033.16. No change to use, egress or occupancy.”
- Alteration, filed Apr 25, 2024, estimated cost $45K, described as “Installation of pipe scaffolding as per plans. Pipe scaffold shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 25, 2024, estimated cost $18K, described as “Installation of temporary needle beams as per plans. Needle beams shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Oct 30, 2023, estimated cost $10K, described as “Installation of temporary personnel/material construction hoist (PM1) for worker access & FDNY readiness during NB construction. Pmh shall comply with nycc 2022 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed Oct 30, 2023, estimated cost $10K, described as “Installation of temporary personnel/material construction hoist (PM2) for worker access & FDNY readiness during NB construction. Pmh shall comply with nycc 2022 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed Oct 27, 2023, estimated cost $1K, described as “Installation of overhead protection during construction for worker safety during NB construction. Overhead protection shall comply with nycc 2022 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Oct 27, 2023, estimated cost $1K, described as “Installation of roof protection for adjacent property during construction. Roof protection shall comply with nycc 2022 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed Oct 26, 2023, estimated cost $1K, described as “Installation of sidewalk shed for pedestrian safety during construction. Sidewalk shed shall comply with nycc 2022 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed Apr 11, 2022, estimated cost $1K, described as “New Curb Cut on Clove Road as per plans, in conjunction with NB application B00622668”
- Alteration, filed Mar 30, 2022, estimated cost $3K, described as “Installation of construction fence to protect site, during full demolition.”
- Alteration, filed Mar 28, 2022, estimated cost $1K, described as “Installation and maintenance of 8' plywood construction fence”
- Alteration, filed Mar 15, 2022, estimated cost $1K, described as “Temporary Dry Standpipe Pressurized Alarm system in conjunction with new building application B00622668”
- Alteration, filed Mar 15, 2022, estimated cost $1K, described as “Underground plumbing in conjunction with new building application B00622668.”

## Property taxes

- Assessment: $18,552,600
- 2026–27 tax: $2,131,838
- Market value (city estimate): $41,228,000
- Taxable value: $17,138,340
- Assessed land: $2,772,900
- Assessed improvements: $15,779,700

## Zoning

R7-1: floor area ratio 3.12 built, 3.44 allowed by base zoning.

## Recent sales

- Aug 25, 2021: $41,500,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 975 Nostrand Avenue - Curb Cut Authorization (City Planning 2024K0296): Authorization, Completed, filed Jul 29, 2024, decided Dec 26, 2024. A curb cut authorization \[ZA\] for a previously approved project at 975 Nostrand Avenue - a FRESH food store in a new 9-story, 250,406 sf, (328DU’s), mixed-use development, including 224,770 square feet of residential floor area and 15,790…
- 975 Nostrand Avenue FRESH Auth (City Planning 2022K0194): Certification, Authorization, Completed, filed Dec 30, 2022, decided Feb 17, 2024. A proposed certification and authorization \[ZR 63-22 and ZR 63-30\] to facilitate a FRESH food store in a new 9-story, 250,406 sf, (328DU’s), mixed-use development, including 224,770 square feet of residential floor area and 15,790 sf of…

## In the news

[Housing Lottery Launches for The Arcadian at 975 Nostrand Avenue in Crown Heights, Brooklyn](https://newyorkyimby.com/2025/07/housing-lottery-launches-for-the-arcadian-at-975-nostrand-avenue-in-crown-heights-brooklyn.html), New York YIMBY, Jul 5, 2025.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
