Parochial school · built 1989 · Block 1417, Lot 7.
Building permits
- Alteration, filed Oct 13, 2026, estimated cost $20K, described as “Install fire sprinkler system in fourth floor, fifth floor & roof plani.a.w. Nfpa 13 2016 edit, as modified by NYC bc 903 appendix q 104 andadding one hose on roof to existing standpipe riser.”
- Alteration, filed May 29, 2026, estimated cost $1K, described as “Installation of system stair tower as per plans. System stair tower shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 25, 2026, estimated cost $1K, described as “Filing to protect neighbor during minor facade repair work. This system is a site specific engineered enclosure system subject to the requirements of bc 3309.17. No change in use, egress, or occupancy”
- Alteration, filed Feb 25, 2026, estimated cost $1K, described as “Installation of temporary construction fence as per plans. No change in use, occupancy or egress.”
- Alteration, filed Feb 25, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Feb 25, 2026, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Feb 13, 2026, estimated cost $889K, described as “St plans filed for temp erection of structural elements as per plans for upcoming major temp event.”
- Alteration, filed Feb 6, 2026, estimated cost $16.0M, described as “Proposed horizontal and vertical enlargement to existing 4 story + basement school/community facility use building.”
- No Work, filed Jun 27, 2023
- Alteration, filed Jan 18, 2023, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 18, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 10, 2022, estimated cost $2K, described as “Fence application hereby being filed in conjunction to alt co #B00654419-I1”
- Alteration, filed Jan 6, 2022, estimated cost $1.0M, described as “Proposed horizontal enlargement to existing 3 story + basement school / community facility use building.”
- Alteration, filed Jul 20, 2021, estimated cost $10K, described as “Register gas equipment and test existing gas piping”
- Alteration, filed Mar 25, 2021, estimated cost $40K, described as “Proposed replace 5 air condensing units on existing roof, mechanical works as per plan. No change of egress, use, or occupancy.”
- No Work, filed May 22, 2019
- No Work, filed May 22, 2019
- No Work, filed Mar 27, 2019
Property taxes
- Assessment
- $2,609,100
- Market value (city estimate)
- $5,798,000
- Taxable value
- $0
- Assessed land
- $377,550
- Assessed improvements
- $2,231,550
Tax breaks
- Nonprofit exemption (religious school), with no end date, about $283,035 a year below the full tax.
Zoning
R7-1: floor area ratio 2.16 built, 3.44 allowed by base zoning.