# 886 Broadway, Brooklyn

Commercial · built 2020 · Block 1582, Lot 15.

On Umarelli: https://umarelli.org/nyc/3015820015/886-broadway

More construction in Bedford-Stuyvesant: https://umarelli.org/nyc/brooklyn/bedford-stuyvesant.md

Every lot on block 1582: https://umarelli.org/nyc/brooklyn/1582.md

## Building permits

- No Work, filed Feb 3, 2026
- Alteration, filed Sep 16, 2025, described as “Non-illuminated non-advertising accessory sign on side of existing entrance canopy - puregym. No change of use, egress or occupancy.”
- Alteration, filed Sep 16, 2025, estimated cost $1K, described as “Illuminated non-advertising double-face projecting accessory sign - puregym. No change of use, egress or occupancy.”
- Alteration, filed Sep 16, 2025, estimated cost $500, described as “Non-illuminated non-advertising accessory sign on front of existing entrance canopy - puregym. No change of use, egress or occupancy.”
- Alteration, filed Sep 16, 2025, estimated cost $2K, described as “Illuminated non-advertising accessory wall sign - puregym. No change of use, egress or occupancy.”
- Alteration, filed Aug 26, 2025, estimated cost $140K, described as “New partial height interior non-bearing partitions and entry check-in doors on second floor, related to NB #321595387, and pa #B01345483. No change in bulk, use, occupancy, or egress.”
- No Work, filed Jul 18, 2023
- Alteration, filed May 4, 2023, estimated cost $900K, described as “Application filed for the interior fit out of new health and fitness establishment in existing space. All work as per plans submitted.”
- Alteration, filed Apr 19, 2023, estimated cost $5K, described as “Erect (2) illuminated accessory business wall signs for blink fitness”
- Alteration, filed May 18, 2022, estimated cost $5K, described as “Installation of pipe scaffolding and overhead protection as per plans. All equipment shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 17, 2021, estimated cost $1K, described as “Installation of support scaffold in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Nov 5, 2020, estimated cost $1K, described as “Installation of sidewalk shed for pedestrian safety during construction. Sidewalk shed shall comply with nycc 2014 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed Apr 6, 2020, estimated cost $1K, described as “Structural drawings in conjunction with nb application (foundations and soe are part of nb filing already approved by DOB HUB). This filing includes only superstructure above foundations (including cellar columns) and construction of…”
- Alteration, filed Mar 24, 2020, estimated cost $1K, described as “Temporary construction fence filed in conjunction with NB #321595387”
- Alteration, filed Feb 24, 2020, estimated cost $1K, described as “15 feet curb cut including splays on the northern side of Stockton Street 102'-6" east of intersection of stockton street and lewis avenue; in conjunction with nb application”
- Alteration, filed Feb 13, 2020, estimated cost $1K, described as “Temporary standpipe during construction of NB 321595387”
- Alteration, filed Jan 28, 2020, estimated cost $1K, described as “Installation of emergency generator and fuel tank”
- Alteration, filed Jan 28, 2020, estimated cost $1K, described as “Mechanical drawings in conjunction with NB 321595387”
- Alteration, filed Jan 28, 2020, estimated cost $4K, described as “Sprinkler and standpipe system drawings in conjunction with nb filing 321595387”
- Alteration, filed Jan 22, 2020, estimated cost $1K, described as “Plumbing drawings in conjunction with NB application”
- Alteration, filed Nov 16, 2018, estimated cost $1K, described as “Installation of sidewalk shed in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Nov 15, 2018, estimated cost $1K, described as “Installation of sidewalk shed in accordance with nycc 14 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Oct 10, 2018, estimated cost $160, described as “Proposed construction fence. No change to use, egress or occupancy under this application”
- Alteration, filed Oct 10, 2018, estimated cost $160, described as “Proposed construction fence. No change to use, egress or occupancy under this application”

## Property taxes

- Assessment: $7,036,200
- 2026–27 tax: $37,820
- Market value (city estimate): $15,636,000
- Taxable value: $6,652,800
- Assessed land: $137,700
- Assessed improvements: $6,898,500

## Tax breaks

- ICAP abatement, through Jun 30, 2049, a $683,876 credit this tax year.

## Zoning

C4-4L: floor area ratio 6.11 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Mar 16, 2018: $6,800,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
