# 129 Malcolm X Boulevard, Brooklyn

Condominium · built c. 1931 · Block 1632, Lot 7501.

On Umarelli: https://umarelli.org/nyc/3016327501/129-malcolm-x-boulevard

More construction in Bedford-Stuyvesant: https://umarelli.org/nyc/brooklyn/bedford-stuyvesant.md

Every lot on block 1632: https://umarelli.org/nyc/brooklyn/1632.md

## Building permits

- Alteration, filed Jan 18, 2024, estimated cost $9K, described as “Installation of 300PSF sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with ch #33 of the NYC code 2022. No change in use, occupancy or egress under this application.”
- Alteration, filed Nov 29, 2023, estimated cost $1K, described as “Install temporary construction fence in conjunction with renovation of existing building for 4-family residence. Alt-co filed under separate application # B00665733-I1.”
- Alteration, filed Sep 20, 2022, estimated cost $589K, described as “Convert existing building from a daycare and 4-family to a 4-family residence only. Construct new stair bulkhead. Demo and construct partitions, finishes, cabinetry.”
- Alteration, filed Aug 23, 2022, estimated cost $53K, described as “Mechanical work filed in conjunction with building conversion to 4-family residence. Alt-co filed separately under DOB # B00665733-I1. Demo existing mechanical system. Install new vrf dx split system, new exhaust fans.”
- Alteration, filed Aug 23, 2022, estimated cost $58K, described as “Structural framing work filed in conjunction with building renovation. Main alt-co filed separately under DOB # B00665733-I1.”
- Alteration, filed Aug 23, 2022, estimated cost $48K, described as “Installation of sprinkler system throughout the entire building in conjunction with building renovation. Install new sprinkler fire service (pl). Alt-co filed under separate application # B00665733”
- Alteration, filed Aug 23, 2022, estimated cost $86K, described as “Plumbing work filed in conjunction with building conversion to 4-family residence. Alt-co filed separately under DOB # B00665733-I1. Installnew plumbing fixtures and related piping. Install new domestic service.”

## Zoning

R6A: floor area ratio 3.12 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
