# 848 Quincy Street, Brooklyn

Private School · built c. 1900 · Block 1633, Lot 58.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/3016330058/848-quincy-street

More construction in Bedford-Stuyvesant: https://umarelli.org/nyc/brooklyn/bedford-stuyvesant.md

Every lot on block 1633: https://umarelli.org/nyc/brooklyn/1633.md

## Building permits

- Alteration, filed May 12, 2022, estimated cost $300, described as “Install exterior non-illuminated wall sign (brooklyn excelsior charter school (logo))”
- Alteration, filed Aug 12, 2021, estimated cost $30K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 11, 2021, estimated cost $4K, described as “Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 11, 2021, estimated cost $126K, described as “Hereby filing facade restoration as per plans filed herewith. No change in use egress, or occupancy.”
- Alteration, filed Jun 13, 2019, estimated cost $5K, described as “Alteration type 3 - construction equipment - scaffold proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Jun 13, 2019, estimated cost $5K, described as “Alteration type 3 - construction equipment - sidewalk-shed proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live LOAD300 per square feet.…”
- Alteration, filed Jun 25, 2018, estimated cost $10K, described as “Installation of a temporary scaffold as per plans in conjunction with facade restoration. No change in use, egress or occupancy. Scaffold to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Jun 20, 2018, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed approximately 197'LONG as per plans in conjunction with facade restoration. No change in use, egress or occupancy. Sidewalk shed shall comply with 2014 NYC building code, chapter 33.”

## Building history

- Alteration, filed Jun 9, 2004, signed off Jan 25, 2006, described as “Exterior &amp; interior renovation of existi ng vacant charter school from b to roof level as noted on plans; demolit ion filed under alt #301742791; SP,SD,FA work to be performed under sepa rate applications filed by a private applicant…”
- Major Renovation — Conversion, filed Aug 17, 2001, plan exam - disapproved, 39 units added, 4 stories, described as “Propose to convert existing school to residential; remove and construct interior partitions; remove and isntall plumbing fixtures and related piping as shown on drawings filed herewith.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $7,300,800
- 2026–27 Tax: $424,050
- Market value (city estimate): $16,224,000
- Taxable value: $3,905,055
- Assessed land: $305,550
- Assessed improvements: $6,995,250

## Tax breaks

- ICAP/ICIP exemption, through Jun 30, 2031, about $331,631 a year below the full tax.

## Zoning

R6B (part of the lot is R6A): floor area ratio 2.05 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- C-O-P (1 PARCEL) (City Planning P1995K0121): Completed, decided Sep 26, 1995. RESTRICTIVE DISPOSITION OF CITY PROPERTY, 1 PARCEL. FIRST\*ATTEMPT FOR COMMUNITY FACILITY USE ONLY

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology