# 55 Albany Avenue, Brooklyn

Hospital · built c. 1928 · Block 1705, Lot 1.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/3017050001/1545-atlantic-avenue

More construction in Bedford-Stuyvesant: https://umarelli.org/nyc/brooklyn/bedford-stuyvesant.md

Every lot on block 1705: https://umarelli.org/nyc/brooklyn/1705.md

## Building permits

- Alteration, filed Mar 13, 2026, estimated cost $400K, described as “Imc 6W fl: removals of interior partitions, finsihes and ductwork at partial 6TH floor within the existing hospital buildings as indicated on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Dec 8, 2025, estimated cost $410K, described as “Imc 9 fl: - modifications of interior partitions and finsihes at partial 9TH floor within the existing hospital buildings as indicated on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed May 14, 2025, estimated cost $750K, described as “Mechanical work to include replacement of 1 chiller with 2 new chillers on the 6TH floor roof as shown on plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 7, 2025, estimated cost $100K, described as “Install new 12,000-gallon fuel storage tank part of emergency generator.”
- Major Renovation, filed Dec 11, 2024, estimated cost $1.1M, 1 story, described as “Includes delivery of premanufactured 2-piece modular building. Building is a premanufactured equipment building which will come fully outfitted with hvac, lighting, envelope, and electrical preinstalled. Site work by others under separate…”
- Alteration, filed Sep 5, 2024, estimated cost $3.5M, described as “Repair existing building exterior facade and roof, to address ecb violations: 35679991L, 35671071M, 35671063M, and DOB violations: 02072024LLFAYC03, 11282023LL03RF01, 11282023LL03RF02, 020724AEUHAZ100086.”
- Alteration, filed Jun 11, 2024, estimated cost $9K, described as “Installation of 300PSF sidewalk shed as per plans. All equipment shall comply with ch #33 of the NYC code 2022. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 25, 2024, estimated cost $1K, described as “Installation of temporary platform for worker access during building construction. Temporary platform shall comply with nycc 2022 chapter 33 bc. No change in egress, use, or occupancy.”
- Alteration, filed Feb 15, 2024, estimated cost $410K, described as “Imc 9 fl: - removal of interior partitions and finsihes at partial 9TH floor within the existing hospital buildings as indicated on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jan 29, 2024, estimated cost $50K, described as “Imc ees ext: plumbing modifications to accommodate site work for the ees project as indicated on plans filed herewith.”
- Alteration, filed Dec 26, 2023, described as “Suspended scaffold outrigger system at 1545 atlantic avenue, brooklyn for exterior facade inspection.”
- Alteration, filed Sep 27, 2023, estimated cost $156K, described as “Install new 2-hour fire-rated high pressure boiler room enclosure as per plans. Install new triplex pump as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 27, 2023, estimated cost $250K, described as “Install one (1) new electric high pressure steam boiler as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 27, 2023, estimated cost $250K, described as “Replacement one (1) high pressure steam boiler with one (1) electric high pressure steam boiler as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 13, 2023, estimated cost $8K, described as “Installation of a temporary egress sprinkler protection on the 2ND floor at the interfaith medical center as per plans submitted herewith, no change in use, egress or occupancy group.”
- Alteration, filed Apr 13, 2023, estimated cost $25K, described as “EES COGEN: Removal of plumbing lines and fixtures as indicated on plans filed herewith.”
- Alteration, filed Apr 13, 2023, estimated cost $100K, described as “EES COGEN: Removal of HVAC equipment and ductwork as indicated on plans filed herewith.”
- Alteration, filed Feb 2, 2023, estimated cost $5.0M, described as “Imc med surg 2 fl: modification of interior partitions and finishes to accommodate alteration at partial 2ND floor within the existing hospital building as indicated on plans filed herewith.”
- Alteration, filed Jan 5, 2023, estimated cost $3.3M, described as “Imc med surg 2 fl: modifications to HVAC equipment and ductwork to accommodate alterations at partial 2ND floor within the existing hospital building as indicated on plans filed herewith.”
- Alteration, filed Jan 5, 2023, estimated cost $1.8M, described as “Imc med surg 2 fl: plumbing and sprinkler modifications to accommodate alterations at partial 2ND floor within the existing hospital building.”
- Alteration, filed Dec 2, 2022, estimated cost $20K, described as “Install temporary weather protection/barrier at parking entrance during construction.”
- Alteration, filed Nov 28, 2022, estimated cost $200K, described as “Imc ees ext: sitework and civil scope to accommodate alterations for the ees riser project as indicated on plans filed herewith.”
- Alteration, filed Nov 16, 2022, estimated cost $20K, described as “Install temporary weather protection/barrier at parking entrance during construction.”
- Alteration, filed Nov 4, 2022, estimated cost $50K, described as “Imc nuc cam: sprinkler and plumbing modifictations to accommodate alterations to the nuclear camera suite within the existing hospital building as indicated on plans filed herewith”
- Alteration, filed Nov 4, 2022, estimated cost $74K, described as “Imc nuc cam: modifictation to HVAC equipment and ductwork to accommodate alterations to the nuclear camera suite within the existing hospital building as indicated on plans filed herewith”

70 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/3017050001/1545-atlantic-avenue.

## Building history

- New Building — Non-residential, filed Jul 22, 2004, permit issued - entire job/work, 4 stories
- Demolition, filed Sep 3, 2002, signed off Nov 7, 2002, stories 1 to 0
- Demolition, filed Aug 29, 2002, signed off Nov 7, 2002, stories 3 to 0
- Demolition, filed Jul 12, 2000, signed off Oct 11, 2000, stories 5 to 0
- Alteration, filed Mar 15, 1999, permit issued - entire job/work, described as “Filing herewith for a new 4 story additi on, one story addition and part al gut rehab of existing hospital”
- Demolition, filed Oct 19, 1998, signed off May 10, 1999, stories 3 to 0

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $36,204,300
- Market value (city estimate): $80,454,000
- Taxable value: $0
- Assessed land: $2,488,950
- Assessed improvements: $33,715,350

## Zoning

R6: floor area ratio 2.10 built, 2.43 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- ST. JOHN'S EPISCOPAL HOSP. MED. CTR (City Planning P1989K1014): Completed. 89-209K: CONSTRUCTION OF A NEW WING (SITE PREPARATION, CONSTRUCTION OF NEW WING AND ALTERATION OF EXISTING BUILDING).