184 Nostrand Avenue, Brooklyn
Parochial School · built 2021 · Block 1753, Lot 42.
Building permits
- Alteration, filed Sep 11, 2026, estimated cost $130, described as “Occupant protection plan filed in conjunction with alt co B01143991-I1.”
- No Work, filed Aug 20, 2026
- Alteration, filed Aug 17, 2026, estimated cost $130, described as “Occupant protection plan filed in conjunction with alt co B01143991-I1.”
- Alteration, filed Nov 21, 2024, estimated cost $851K, described as “Interior alteration to existing three (3) story school building.”
- No Work, filed Sep 25, 2022
- No Work, filed Aug 3, 2022
- No Work, filed Jun 30, 2022
- No Work, filed Jun 30, 2022
- Alteration, filed Jan 4, 2022, estimated cost $1K, described as “Standpipe application filed in conjunction with NB, Job Number: 320416867.”
- Alteration, filed Jan 3, 2022, estimated cost $1K, described as “Boiler Equipment application filed for installation of a 275 gallon diesel storage tank located in the cellar and 130 gallon belly tank located on the roof.”
- Alteration, filed Jan 3, 2022, estimated cost $1K, described as “Mechanical application filed for installation of 150 KW Diesel fuel emergency generator on lot 42 to serve lodging house with sleeping accommodations on the same lot.”
- Alteration, filed May 20, 2021, estimated cost $1K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 17, 2021, estimated cost $1K, described as “Installation of temporary roof protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 17, 2021, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 12, 2021, estimated cost $1K, described as “Installation of temporary needle beam as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 4, 2021, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 10, 2019, estimated cost $202, described as “Curb cut filed in conjunction with NB Job Number 320416867.”
- Alteration, filed Mar 13, 2019, estimated cost $160, described as “Construction fence filed,”
Building history
- New Building — Non-residential, filed Jan 3, 2012, signed off Aug 14, 2024, 4 stories
- Demolition, filed Jan 3, 2012, signed off Jun 5, 2015, stories 1 to 0, described as “Demolition of building”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $5,509,800
- Market value (city estimate)
- $12,244,000
- Taxable value
- $0
- Assessed land
- $483,300
- Assessed improvements
- $5,026,500
Tax breaks
- Nonprofit exemption (religious school), with no end date, about $597,703 a year below the full tax.
Zoning
M1-2: floor area ratio 3.31 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Change to an Earlier Grant (Board of Standards and Appeals 16-12-BZVI): Change to an Earlier Grant, Granted, filed Jan 15, 2025, decided Jul 13, 2026. Amendment of a previously approved Special Permit (§73-19) permitting a school (Congregation Adas Yereim) contrary to use regulations (§42-00). The amendment seeks changes to the previously approved design and Board conditions. M1-2 zoning…
- Change to an Earlier Grant (Board of Standards and Appeals 16-12-BZV): Change to an Earlier Grant, Withdrawn, filed Apr 5, 2022, decided Apr 25, 2023. Amendment of a previously approved Special Permit (§73-19) permitting a school (Congregation Adas Yereim) contrary to use regulations (§42-00). The amendment seeks changes to the previously approved design and Board conditions. M1-2 zoning…
- Change to an Earlier Grant (Board of Standards and Appeals 16-12-BZII): Change to an Earlier Grant, Granted, filed Apr 2, 2015, decided Mar 19, 2019. Amendment of a previously approved Special Permit (§73-19) permitting a school (Congregation Adas Yereim) contrary to use regulations (§42-00). The amendment seeks changes to the interior, an increase in the height of the building. M1-2…
- Variance or Special Permit (Board of Standards and Appeals 16-12-BZ): Variance or Special Permit, Granted, filed Jan 23, 2012, decided Jan 14, 2014. Special Permit (§73-19) to allow for a school (Congregation Adas Yereim) contrary to use regulations (§42-00). M1-2 zoning district.