510 Gates Avenue, Brooklyn
Care facility · built 2024 · Block 1814, Lot 23.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- New Building — Multi-Family, filed Oct 21, 2021, 32 units, 6 stories, described as “Propose new 6-story plus cellar building as non-profit institution with sleeping accommodations (use group 3A) as per plan. Building as per plan. Obtain new c of o.”
- Alteration, filed Jun 13, 2025, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed and pipe scaffold as per plans during new building work. No change in use, egress or occupancy. Sidewalk shed & pipe scaffold to comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Jun 13, 2025, estimated cost $10K, described as “Installation and use of debris chute as per plans submitted. Debris chute shall comply with chapter #33 of NYC building code. This application involves no change in occupancy, use or egress.”
- No Work, filed Jul 8, 2024
- Alteration, filed Jun 21, 2024, described as “Installation of multi-point scaffolding as per plan and in accordance with chapter 33 of NYC building code. No change in use, egress, or occupancy. No change in use, egress or occupancy.”
- Alteration, filed May 20, 2024, estimated cost $10K, described as “Installation of temporary scaffold as per plans in conjunction with NB construction. No change in use, egress or occupancy. Scaffold to comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Jan 25, 2024, estimated cost $1K, described as “Installation of construction fence in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Dec 26, 2023, estimated cost $10K, described as “Installation of single personnel/material hoist in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Dec 8, 2023, estimated cost $1K, described as “Installation of overhead protection in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Dec 8, 2023, estimated cost $1K, described as “Installation of sidewalk shed in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Dec 8, 2023, estimated cost $1K, described as “Installation of supported scaffolding in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Jun 20, 2023, estimated cost $8K, described as “Installation of heavy duty sidewalk shed as per plans. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2022 NYC building code.”
- Alteration, filed Sep 29, 2022, estimated cost $5K, described as “Installation of construction fence, to protect site during full demolition.”
- Alteration, filed May 26, 2022, estimated cost $5K, described as “Installation of temporary construction chute for full demolition of 3 story and basement/cellar building. using elevator shaft.”
Property taxes
- Assessment
- $107,550
- Market value (city estimate)
- $239,000
- Taxable value
- $0
- Assessed land
- $107,550
Tax breaks
- Nonprofit exemption (nonprofit, use planned), with no end date, about $11,667 a year below the full tax.
Zoning
R6A (part of the lot is R6B): floor area ratio 3.91 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- DOP 510 Gates Avenue (City Planning P2014K0045): Completed, decided Nov 15, 2013. Acquisition of office space for the establishment of a Neighborhood Opportunity Network Office at 510 Gates Avenue in the Bedford-Stuyvesant Section of Community District 3 in Brooklyn.
- 510 Gates Avenue (City Planning P2013K0324): Completed, decided Apr 4, 2013. Acquisition of office space for the establishment of a Neighborhood Opportunity Network Office at 510 Gates Avenue in the Bedford-Stuyvesant Section of Community District 3 in Brooklyn
In the news
The Doe Fund Breaks Ground on Transitional Housing at 510 Gates Avenue in Bed-Stuy, Brooklyn, New York YIMBY, Oct 14, 2023.