# 35 Kingston Avenue, Brooklyn

Apartment Building · 21 units · built 2022 · Block 1871, Lot 6.

On Umarelli: https://umarelli.org/nyc/3018710006/35-kingston-avenue

More construction in Bedford-Stuyvesant: https://umarelli.org/nyc/brooklyn/bedford-stuyvesant.md

Every lot on block 1871: https://umarelli.org/nyc/brooklyn/1871.md

## Building permits

- Alteration, filed Jan 16, 2023, estimated cost $1K, described as “Installation and use of temporary suspended scaffolding as per plans. No change to use, egress or occupancy.”
- Alteration, filed Nov 24, 2022, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. Pipe scaffolding shall comply with chapter #33 of the code. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 21, 2022, estimated cost $5K, described as “Proposed Mechanical filing in conjunction with NB#321946481”
- Alteration, filed Jul 13, 2022, estimated cost $5K, described as “Plumbing Application is in conjunction with NB JOB NO#321946481”
- Alteration, filed Jan 3, 2022, estimated cost $5K, described as “Installation of 300 psf sidewalk shed, overhead protection and roof protection as per plans. All equipment shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Dec 31, 2021, estimated cost $5K, described as “Installation of 300 psf sidewalk shed and roof protection as per plans. All equipment shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Dec 2, 2021, estimated cost $5K, described as “SOE Application is in conjunction with NB JOB NO#321946481”
- Alteration, filed Dec 2, 2021, estimated cost $5K, described as “FO/EA Application is in conjunction with NB JOB NO#321946481”
- Alteration, filed Dec 2, 2021, estimated cost $5K, described as “Structural Application is in conjunction with NB JOB NO#321946481”
- Alteration, filed Jul 17, 2020, estimated cost $2K, described as “Installation of 10' new curb cut in conjunction with new building #321946481. No change in use,egress or occupancy.”
- Alteration, filed Sep 11, 2019, estimated cost $160, described as “Proposed construction fence. No change to use, egress or occupancy under this application.”
- Alteration, filed Sep 5, 2019, estimated cost $160, described as “Proposed construction fence. No change to use, egress or occupancy under this application.”

## Property taxes

- Assessment: $1,582,200
- 2026–27 Tax: $4,815
- Market value (city estimate): $3,516,000
- Taxable value: $38,709
- Assessed land: $269,550
- Assessed improvements: $1,312,650

## Tax breaks

- 421-a exemption, through Jun 30, 2059, about $191,995 a year below the full tax.

## Zoning

R6A: floor area ratio 3.32 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jun 3, 2019: $2,600,000, sold with other lots

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
