# 8 Grand Avenue, Brooklyn

Apartment Building · 40 units · built 1994 · Block 1877, Lot 27.

On Umarelli: https://umarelli.org/nyc/3018770027/8-grand-avenue

More construction in Brooklyn Navy Yard: https://umarelli.org/nyc/brooklyn/brooklyn-navy-yard.md

Every lot on block 1877: https://umarelli.org/nyc/brooklyn/1877.md

## Building permits

- Alteration, filed Nov 6, 2024, estimated cost $3K, described as “Indirectly illuminated advertising sign # 2 (10'-6" x 36') designed for changeable copy. No structural work under this application. No change in use, egress, or occupancy.”
- Alteration, filed Nov 6, 2024, estimated cost $3K, described as “Indirectly illuminated advertising sign # 1 (10'-6" x 36') designed for changeable copy. No structural work in this application. No change in use, egress, or occupancy.”
- Alteration, filed Feb 5, 2024, described as “Installation of suspended scaffold during facade inspection/ Repairs.”
- Alteration, filed Nov 16, 2023, estimated cost $4K, described as “Proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Sep 26, 2023, estimated cost $435K, described as “Interior plumbing renovation, as per drawings no change in use, egress or occupancy”
- Alteration, filed Sep 21, 2023, estimated cost $135K, described as “Interior mechanical renovation, as per drawings no change in use, egress or occupancy”
- Alteration, filed Sep 21, 2023, estimated cost $1.7M, described as “Interior renovation, as per drawings no change in use, egress or occupancy”
- Alteration, filed Nov 17, 2022, estimated cost $22K, described as “Filed to conduct forensic inspection for the foundation required to signoff the new building application 300152304”
- Alteration, filed Nov 15, 2022, estimated cost $24K, described as “Filing herewith plumbing modification on the first floor as indicated on the drawings. No chasnge in use egress or occupancy”
- Alteration, filed Nov 11, 2022, estimated cost $45K, described as “Filing herewith interior renovation of existing commercial space includes non bearing partitons, new millwork cabinets and finishes as indicated on the drawings”
- Alteration, filed Aug 16, 2022, estimated cost $16K, described as “Modification to existing sprinkler system.”
- Alteration, filed Aug 16, 2022, estimated cost $89K, described as “Interior demo and build-out of non-load bearing partitions at commercial units. Walls to public halls to be repairs to 1 hour fire rated partitions. Ceiling to be patch and repairs where necessary to obtain 1 hr firerating.”
- Alteration, filed Jul 27, 2022, estimated cost $30K, described as “Install heat pump units at the facility including energy recovery unit.”
- Alteration, filed Nov 4, 2019, estimated cost $385K, described as “Filing for installation of new class I standpipe system and modification of existing building sprinklers in conjunction with ALT-1 application 321593067.No change to use, egress or occupancy under this application”
- Alteration, filed Oct 9, 2019, estimated cost $5K, described as “Installation of a temporary scaffold as per plans during general construction work. No change in use, egress or occupancy. Scaffold to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Oct 9, 2019, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed to comply with chapter 33 of building code of 2014”
- Alteration, filed Aug 28, 2019, estimated cost $8K, described as “Replacing roof drains and installation of storm risers on floors 1ST thru 7TH and roof. No change in occupancy use and egress”

## Building history

- Major Renovation — Conversion, filed May 9, 2019, permit issued - entire job/work, 46 units added, 7 stories
- New Building, filed Feb 4, 1992, permit issued - entire job/work, 2 stories

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $6,356,250
- 2026–27 Tax: $745,631
- Market value (city estimate): $14,125,000
- Taxable value: $5,994,299
- Assessed land: $453,150
- Assessed improvements: $5,903,100

## Zoning

M1-2: floor area ratio 5.07 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Oct 26, 2021: $17,250,000, sold with other lots
- Jul 2, 2018: $20,600,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or Special Permit (Board of Standards and Appeals 2023-68-BZ): Variance or Special Permit, Granted, filed Nov 13, 2023, decided Oct 21, 2024. Variance (§72-21) to permit the conversion from commercial to residential contrary to underlying use requirements (§42-10). M1-2 zoning district.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
