230 Classon Avenue, Brooklyn
House of worship · built c. 1928 · Block 1909, Lot 47.
Building permits
- Alteration, filed Mar 18, 2025, described as “Installation of temporary pipe scaffold as per plan. No change in use, egress or occupancy.the pipe scaffold in the back of the church over the glass atrium and under neath the glass to allow the customer to install gutters.”
- Alteration, filed Oct 11, 2022, estimated cost $10K, described as “Job filing for record purposes only. Incorrectly filed and permited as an ALT-CO under job number B0049899 (to be withdrawn). Work has been completed. Removal of exterior chimney as shown on drawings filed herewith. No change to Egress or…”
- Alteration, filed Jul 2, 2021, estimated cost $20K, described as “Installation of dual 7000 # capacity personnel/material hoists during bldg alteration, filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elevator application submitted…”
- Alteration, filed Jun 16, 2021, described as “Pipe scaffold proposed installation of pipe scaffold as per plan. No change in use,egress or occupancy.”
- Alteration, filed Jun 16, 2021, estimated cost $1K, described as “Plastic barricade proposed installation of plastic barricade as per plan. No change in use,egress or occupancy.”
- Alteration, filed Apr 22, 2021, estimated cost $1K, described as “Plastic barricade proposed installation of plastic barricade as per plan. No change in use,egress or occupancy.”
- Alteration, filed Apr 22, 2021, described as “Plywood fence proposed installation of plywood fence as per plan. No change in use, egress or occupancy.”
- Alteration, filed Apr 22, 2021, estimated cost $1K, described as “Fire escape protection proposed installation of plastic fire escape protection as per plan. No change in use,egress or occupancy.”
- Alteration, filed Apr 22, 2021, estimated cost $1K, described as “Roof protection proposed installation of roof protection as per plan. No change in use,egress or occupancy”
- Alteration, filed Apr 21, 2021, described as “Sidewalk shed proposed installation of sidewalk shed as per plan. No change in use,egress or occupancy.”
- Alteration, filed Mar 12, 2021, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 3, 2021, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
Property taxes
- Assessment
- $1,948,050
- Market value (city estimate)
- $4,329,000
- Taxable value
- $0
- Assessed land
- $279,900
- Assessed improvements
- $1,668,150
Tax breaks
- Nonprofit exemption (house of worship), with no end date, about $211,324 a year below the full tax.
Zoning
R6: floor area ratio 1.33 built, 2.43 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of St. Mary's Episcopal Church (Individual Landmark). 12 Landmarks Preservation Commission permits are on file.
Board and land use applications
- ST MARY'S EPISCOPAL CHURCH (City Planning P1982K0403): Completed, decided Jan 14, 1982. LANDMARK
In the news
Housing Lottery Launches for Parish House At 230 Classon Avenue in Clinton Hill, Brooklyn, New York YIMBY, Mar 1, 2023.