1 Putnam Avenue, Brooklyn
Condominium · 41 units · built 2024 · Block 1981, Lot 7503.
Building permits
- New Building — Multi-Family, filed Mar 25, 2022, estimated cost $10.0M, 41 units, 8 stories, described as “New eight (8) story and cellar mixed use (residential and commercial) building”
- Alteration, filed Sep 11, 2026, estimated cost $312K, described as “Interior renovation on cellar level to establish use for kids gym and obtain certificate of occupancy. Mechanical, plumbing and sprinkler applications filed subsequent to this alt co.”
- Alteration, filed Jul 11, 2025, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - 1P. No change of use, egress or occupancy.”
- Alteration, filed Jul 7, 2025, estimated cost $8K, described as “Sub-slab depressurization system (ssds) installation in conjunction w/ NB# B00696890-I1, incl all penetration ductwork, fans, accessories & supports from below grade slab to roof. No change in use, egress or occupancy.”
- Alteration, filed Aug 22, 2024, estimated cost $2K, described as “Installation of beta max hoist as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed May 8, 2024, estimated cost $30K, described as “Temporary standpipe in conjunction with new building”
- Alteration, filed Feb 28, 2024, estimated cost $20K, described as “Installation of 300 psf sidewalk shed, pipe scaffolding, overhead protection, plywood fence, beta max and roof protection as per plans. All equipment shall comply with CH#33 of the 2022 code. No change in use, egress or occupancy under…”
- Alteration, filed Jan 31, 2024, estimated cost $275K, described as “Installation of mechanical systems”
- Alteration, filed Nov 3, 2023, estimated cost $1.3M, described as “Installation of fire protection systems”
- Alteration, filed Oct 2, 2023, estimated cost $150K, described as “Installation of plumbing fixtures”
- Alteration, filed Apr 24, 2023, estimated cost $3K, described as “Installation of a temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 14, 2023, estimated cost $5K, described as “Installation of construction fence to protect site, during full demolition.”
- Alteration, filed May 12, 2022, estimated cost $15K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around property perimeter on grade to enclose site for construction operations.”
- Alteration, filed Apr 25, 2022, estimated cost $5.5M, described as “Foundation work filed in conjunction with NB application. Application is filed to obtain 421A privileges. NB filed under application number: B00696890-I1”
- Alteration, filed Mar 25, 2022, estimated cost $5K, described as “New curb cut”
Property taxes
- Assessment
- $6,113,700
- 2026–27 tax
- $724,997
- Market value (city estimate)
- $13,586,000
- Taxable value
- $5,952,599
- Assessed land
- $455,400
- Assessed improvements
- $5,658,300
- Condo units with their own tax lots
- 2
Zoning
R7A: floor area ratio 5.03 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
In the news
Housing Lottery Launches for 1 Putnam Avenue in Clinton Hill, Brooklyn, New York YIMBY, Jul 22, 2025.