# 1 Putnam Avenue, Brooklyn

Condominium · 41 units · built 2024 · Block 1981, Lot 7503.

On Umarelli: https://umarelli.org/nyc/3019817503/1-putnam-avenue

More construction in Clinton Hill: https://umarelli.org/nyc/brooklyn/clinton-hill.md

## Building permits

- New Building — Multi-Family, filed Mar 25, 2022, estimated cost $10.0M, 41 units, 8 stories, described as “New eight (8) story and cellar mixed use (residential and commercial) building”
- Alteration, filed Sep 11, 2026, estimated cost $312K, described as “Interior renovation on cellar level to establish use for kids gym and obtain certificate of occupancy. Mechanical, plumbing and sprinkler applications filed subsequent to this alt co.”
- Alteration, filed Jul 11, 2025, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - 1P. No change of use, egress or occupancy.”
- Alteration, filed Jul 7, 2025, estimated cost $8K, described as “Sub-slab depressurization system (ssds) installation in conjunction w/ NB# B00696890-I1, incl all penetration ductwork, fans, accessories & supports from below grade slab to roof. No change in use, egress or occupancy.”
- Alteration, filed Aug 22, 2024, estimated cost $2K, described as “Installation of beta max hoist as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed May 8, 2024, estimated cost $30K, described as “Temporary standpipe in conjunction with new building”
- Alteration, filed Feb 28, 2024, estimated cost $20K, described as “Installation of 300 psf sidewalk shed, pipe scaffolding, overhead protection, plywood fence, beta max and roof protection as per plans. All equipment shall comply with CH#33 of the 2022 code. No change in use, egress or occupancy under…”
- Alteration, filed Jan 31, 2024, estimated cost $275K, described as “Installation of mechanical systems”
- Alteration, filed Nov 3, 2023, estimated cost $1.3M, described as “Installation of fire protection systems”
- Alteration, filed Oct 2, 2023, estimated cost $150K, described as “Installation of plumbing fixtures”
- Alteration, filed Apr 24, 2023, estimated cost $3K, described as “Installation of a temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 14, 2023, estimated cost $5K, described as “Installation of construction fence to protect site, during full demolition.”
- Alteration, filed May 12, 2022, estimated cost $15K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around property perimeter on grade to enclose site for construction operations.”
- Alteration, filed Apr 25, 2022, estimated cost $5.5M, described as “Foundation work filed in conjunction with NB application. Application is filed to obtain 421A privileges. NB filed under application number: B00696890-I1”
- Alteration, filed Mar 25, 2022, estimated cost $5K, described as “New curb cut”

## Property taxes

- Assessment: $6,113,700
- 2026–27 tax: $724,997
- Market value (city estimate): $13,586,000
- Taxable value: $5,952,599
- Assessed land: $455,400
- Assessed improvements: $5,658,300
- Condo units with their own tax lots: 2

## Zoning

R7A: floor area ratio 5.03 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[Housing Lottery Launches for 1 Putnam Avenue in Clinton Hill, Brooklyn](https://newyorkyimby.com/2025/07/housing-lottery-launches-for-1-putnam-avenue-in-clinton-hill-brooklyn.html), New York YIMBY, Jul 22, 2025.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
