# 1187 Fulton Street, Brooklyn

Three-family with store · built 2024 · Block 2000, Lot 43.

On Umarelli: https://umarelli.org/nyc/3020000043/1187-fulton-street

More construction in Bedford-Stuyvesant: https://umarelli.org/nyc/brooklyn/bedford-stuyvesant.md

## Building permits

- Alteration, filed Jun 23, 2025, estimated cost $5K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jun 24, 2024, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jul 17, 2023, estimated cost $1K, described as “Filing for construction fence as per plans”
- Alteration, filed Nov 12, 2021, estimated cost $1K, described as “Structural work in conjunction with new building application # 321590408.”
- Alteration, filed Aug 19, 2021, estimated cost $1K, described as “Mechanical work in conjunction with New Building Application #321590408”
- Alteration, filed Jul 29, 2021, estimated cost $1K, described as “Sprinkler and standpipe work in conjunction with new building application # 321590408”
- Alteration, filed Jul 29, 2021, estimated cost $1K, described as “Plumbing work in conjunction with New Building Application #321590408”

## Property taxes

- Assessment: $441,000
- 2026–27 tax: $23,040
- Market value (city estimate): $980,000
- Taxable value: $185,220
- Assessed land: $81,000
- Assessed improvements: $360,000

## Tax breaks

- 420-c exemption, through Jun 30, 2083, about $31,816 a year below the full tax.

## Zoning

R7D: floor area ratio 2.98 built, 4.66 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- DeKalb Commons (NCP-NIHOP) (UDAAP) (City Planning P2017K0364): Urban development action area, Completed, decided Dec 23, 2020. This is an application by HPD requesting UDAAP designation, project approval and disposition of city-owned property to facilitate 3 new 4-7 story buildings (86 dwelling units), with ground floor retail and community facility, at 633-639…

## In the news

[Excavation Underway at 1187 Fulton Street in Bed-Stuy, Brooklyn](https://newyorkyimby.com/2023/11/excavation-underway-at-1187-fulton-street-in-bed-stuy-brooklyn.html), New York YIMBY, Nov 7, 2023.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
