139 Flatbush Avenue, Brooklyn
Condominium · built 2003 · Block 2001, Lot 7501.
Building permits
- Alteration, filed Nov 5, 2026, estimated cost $10K, described as “Filing to obtain equipment use permits (Certificate of Compliance) for the Condensing unit CU-12-1 erroneously omitted from filing approved, permitted & signed off under application# B00343288-I1.”
- Alteration, filed Oct 28, 2026, estimated cost $600K, described as “Concrete repairs to existing parking garage. No change in use, egress, or occupancy.”
- Alteration, filed Jul 21, 2026, estimated cost $210K, described as “Replacement of 60 ton rooftop unit. No change to egress, use, or occupancy.”
- Alteration, filed May 11, 2026, estimated cost $600K, described as “Facade repair on the 1ST to the 5TH floors. No change in use, egress, or occupancy.”
- Alteration, filed May 6, 2026, estimated cost $528K, described as “Gap factory (space #1160): general construction inclusive of interior partitions modifications for retail store build out. No change in use, egress or occupancy.”
- Alteration, filed Apr 23, 2026, estimated cost $50K, described as “Structural work to remove existing elevator & escalator walls between the cellar to the 1ST floor and infill elevator & escalator openings in the 1ST floor slab.”
- Alteration, filed Apr 22, 2026, estimated cost $25K, described as “Remove and cap plumbing fixtures.”
- Alteration, filed Apr 22, 2026, estimated cost $100K, described as “Removal of mechanical ducts and associated piping.”
- Alteration, filed Apr 22, 2026, estimated cost $85K, described as “Remove/cap and install sprinkler heads.”
- Alteration, filed Apr 21, 2026, estimated cost $600K, described as “The gap - removal and installation of interior partitions and finishes. No change in use, egress, or occupancy.”
- Alteration, filed Feb 27, 2026, estimated cost $10K, described as “Installation of a heavy duty sidewalk shed as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Feb 14, 2025, estimated cost $83K, described as “Modifications to existing plumbing system. No change in use egress or occupancy.”
- Alteration, filed Jan 31, 2025, estimated cost $225K, described as “Modifications to non load bearing partitions, no change in egress, use or occupancy.”
- No Work, filed Dec 2, 2024, described as “Presentation lecture and reception.”
- Alteration, filed Sep 10, 2024, estimated cost $1K, described as “Application for the installation and use of material hoist as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Aug 1, 2024, estimated cost $206K, described as “Interior alteration to existing retail tenant space. Remove non-load bearing paritions and finishes and install new non-load bearing partitions and finishes as shown on plans. Storefront modifications. No change of use, egress or…”
- Alteration, filed Apr 18, 2024, estimated cost $18K, described as “Minor architectural work to install entry doors at existing retail space (B5) on 1st floor as indicated on drawings.”
- Alteration, filed Aug 30, 2023, estimated cost $3K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Aug 18, 2023, estimated cost $12K, described as “Alteration of (12) sprinkler heads and (2) shut off valves to coordinate beneath the protection deck of the existing loading bay.”
- Alteration, filed Aug 17, 2023, estimated cost $378K, described as “Repair structural portions of the loading bay.”
- Alteration, filed Aug 8, 2023, estimated cost $100K, described as “Replacement of existing rooftop air conditioning unit on existing steel dunnage. No change in use egress and occupancy.”
- Alteration, filed Jul 20, 2023, estimated cost $3K, described as “Illuminated non-advertising accessory wall sign - chuck e. Cheese. No change of use, egress or occupancy.”
- Alteration, filed Feb 21, 2023, estimated cost $18K, described as “Minor renovation of electrical room on 11TH floor as per plans. No change in use, egress or occupancy.”
- No Work, filed Nov 21, 2022, described as “Lecture / networking with light refreshments”
- Alteration, filed Sep 2, 2022, estimated cost $3K, described as “Addition of new sink associated with renovation of existing conference room on 11TH floor as per plans. No change in use, egress or occupancy.”
46 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $104,810,400
- Market value (city estimate)
- $232,912,000
- Taxable value
- $0
- Assessed land
- $10,352,700
- Assessed improvements
- $94,457,700
- Condo units with their own tax lots
- 2
Zoning
C6-4: floor area ratio 4.73 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Proposed Extension of the Downtown Brooklyn BID (City Planning 2027K0210): Business improvement district, In Public Review, filed Oct 6, 2026. An action to facilitate a merger of 2 Business Improvement Districts (BID) and 1 Special Assessment District (SAD). The merger of the MetroTech Area BID, Court-Livingston-Schermerhorn BID and Fulton Mall SAD in Downtown Brooklyn, Community…