475 Carlton Avenue, Brooklyn
Co-op · 304 units · built 1974 · Block 2007, Lot 14.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Jul 7, 2026, estimated cost $950K, described as “Filing for solar panel structural framing as per plans filed herewith. No change in use occupancy or egress.”
- Alteration, filed Jul 7, 2026, estimated cost $950K, described as “Filing for Solar panel structural framing as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Jun 30, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Jun 30, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Apr 20, 2026, estimated cost $75K, described as “Modification to existing T-Mobile site. Temporary relocation of 4 equipment cabinets, 9 RRUs and 3 sectors (12 antennas).”
- Alteration, filed Apr 10, 2026, estimated cost $108K, described as “Demolish and replace existing dry sprinkler system back to and including the dry valve in open/unheated garage at the cellar.”
- Alteration, filed May 22, 2025, estimated cost $33K, described as “Install fire sprinkler system as per plans. Replace existing fire pump with new fire pump.”
- Alteration, filed May 22, 2025, estimated cost $33K, described as “Install fire sprinkler system as per plans. Replace existing fire pump with new fire pump.”
- Alteration, filed May 22, 2025, estimated cost $7K, described as “Install fire sprinkler system as per plans.”
- Alteration, filed Apr 25, 2025, described as “Temporary installation of adjustable suspended scaffold. No change in use, egress, or occupancy. Designated primary site supervisor: jaroslaw jablonski”
- Alteration, filed Apr 25, 2025, described as “Temporary installation of adjustable suspended scaffold. No change in use, egress, or occupancy. Designated primary site supervisor: jaroslaw jablonski”
- Alteration, filed Apr 25, 2025, described as “Temporary installation of adjustable suspended scaffold. No change in use, egress, or occupancy. Designated primary site supervisor: jaroslaw jablonski”
- Alteration, filed Mar 26, 2025, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc”
- Alteration, filed Mar 26, 2025, estimated cost $25K, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc”
- Alteration, filed Mar 14, 2025, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc”
- Alteration, filed Oct 7, 2024, estimated cost $651K, described as “Replacement of exhaust fans, h&v units, radiators valves, and lobby heating system as shown on plans”
- Alteration, filed Oct 7, 2024, estimated cost $530K, described as “Replacement of exhaust fans, h&v units, radiators valves, and lobby heating system as shown on plans”
- Alteration, filed Oct 7, 2024, estimated cost $1.5M, described as “Replacement of exhaust fans, h&v units, radiators valves, and lobby heating system as shown on plans”
- Alteration, filed Sep 18, 2024, estimated cost $4.2M, described as “Filing for plaza and garage repairs as per plans filed herewith. No change in use occupancy or egress.”
- Alteration, filed Sep 17, 2024, estimated cost $160K, described as “Replacement of existing sanitary and vent piping and new backflow preventer as shown on plans”
- Alteration, filed Sep 17, 2024, estimated cost $205K, described as “Replacement of existing sanitary and vent piping, installation of new sump pump, and new backflow preventer as shown on plans”
- Alteration, filed Sep 17, 2024, estimated cost $265K, described as “Replacement of existing sanitary and vent piping and new backflow preventer as shown on plans”
- Alteration, filed Jun 10, 2024, estimated cost $810K, described as “Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Jun 10, 2024, estimated cost $1.3M, described as “Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Jun 6, 2024, estimated cost $666K, described as “Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress.”
1 more, older permit is in this building’s full list on the map.
Building history
- Alteration, filed Oct 18, 2017, permit issued - entire job/work, described as “Propose to amend co #217817 to increase the occupant load at existing community room as per plans filed herewith; amended co required.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $11,543,400
- 2026–27 Tax
- $196,587
- Market value (city estimate)
- $25,652,000
- Taxable value
- $0
- Assessed land
- $844,650
- Assessed improvements
- $10,698,750
Tax breaks
- Mitchell-Lama exemption, with no end date.
Zoning
R7-2: floor area ratio 3.81 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Fulton Street(FAB Alliance) BID Expansion (City Planning P2015K0524): Completed. Expand Existing Fulton St BID into Downtown Brooklyn