520 Clinton Avenue, Brooklyn
House of worship · built c. 1891 · Block 2010, Lot 10.
Building permits
- Alteration, filed Dec 15, 2025
- Alteration, filed Oct 12, 2025, estimated cost $30K, described as “Underpin courtyard wall for the installation of an elevator pit.”
- Alteration, filed Jul 28, 2023, estimated cost $577K, described as “Exterior restoration of existing church. Work to include repairs to existing fire escape, removal of non-egress steel stair and repair/replacement of exterior stucco, masonry, and gutters. Structural work filed under application #…”
- Alteration, filed May 5, 2023, estimated cost $97K, described as “Nave foundation work including reconstruction of floor and supports as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 5, 2023, estimated cost $1.7M, described as “Interior and exterior church renovation including roof, windows work, and new elevator as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed May 5, 2023, estimated cost $501K, described as “New spread footing, sheathing and beams installation as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed May 4, 2023, estimated cost $525K, described as “Mechanical equipment installation including kitchen rangehood exhaust system and associated ducts and piping as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 4, 2023, estimated cost $121K, described as “Plumbing fixtures installation and modification and associated piping as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Dec 16, 2020, described as “Sidewalk shed proposed installation of sidewalk shed as per plan. No change in use,egress or occupanc”
- Alteration, filed Dec 1, 2020, described as “Pipe scaffold proposed installation of pipe scaffold as per plan. No change in use,egress or occupancy.”
- Alteration, filed Jan 22, 2020, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Jan 22, 2020, estimated cost $1K, described as “Installation of temporary (24'-102') high pipe scaffold at various levels for facade repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
Property taxes
- Assessment
- $1,857,600
- Market value (city estimate)
- $4,128,000
- Taxable value
- $0
- Assessed land
- $317,700
- Assessed improvements
- $1,539,900
Tax breaks
- Nonprofit exemption (house of worship), with no end date, about $201,512 a year below the full tax.
Zoning
R6A (part of the lot is R7A): floor area ratio 0.94 built, 3.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of Church of St. Luke & St. Matthew (Episcopal) (Individual Landmark). 25 Landmarks Preservation Commission permits are on file.