547 Clinton Avenue, Brooklyn
Utility · Block 2011, Lot 1.
Building permits
- Alteration, filed Oct 21, 2025, estimated cost $1.7M, described as “Replacement of six (6) computer room air conditioning (CRAC) units serving network equipment spaces.”
- Alteration, filed Sep 15, 2025, estimated cost $251K, described as “Water service alterations for verizon building.scope of work does not modify the use, occupancyor egress for the building. Scope of work is for limited interior non-structural demolition and minor interior renovations.”
- Alteration, filed Oct 3, 2022, estimated cost $25K, described as “Interior renovation work related to the construction of ats (automatic transfer switch) closet as shown on plans filed herewith. No change in use, egress or occupancy under this application”
- Alteration, filed Sep 20, 2022, estimated cost $1K, described as “Installation supported pipe scaffolding as indicated on the attached drawings. There are no changes in use, egress or occupancy”
- Alteration, filed May 9, 2022, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 1, 2020, estimated cost $1.2M, described as “Mechanical work related to the Compressor Dehydrator Chiller Replacement. Scope includes new AC unit, drycoolers, and related piping and ductwork”
- Alteration, filed Aug 21, 2020, estimated cost $300K, described as “Construct concrete loading dock & steel frame roof above the existing underground cable vault. Remove vault top slab & beams. Abandon & infill existing vault with compacted fill. Construct new concrete top slab at lower elevation. New…”
- Alteration, filed Dec 13, 2019, estimated cost $1.2M, described as “Mechanical work related to the installation of (3) new dry coolers and pump packages.”
- Alteration, filed Dec 11, 2019, estimated cost $800K, described as “Filing for structural framing related to the installation of drycoolers.”
- Alteration, filed Nov 19, 2019, estimated cost $36K, described as “Installation of system scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 22, 2019, estimated cost $41K, described as “Installation of Verizon telecommunications site. Install 3 new sectors and 4 new GPS units on the roof and install equipment in existing room on 6th floor. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.”
Zoning
R6A (part of the lot is R7A): floor area ratio 0.00 built, 3.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.