# 297 Myrtle Avenue, Brooklyn

Apartment Building · 200 units · built 1942 · Block 2040, Lot 1.

On Umarelli: https://umarelli.org/nyc/3020400001/297-myrtle-avenue

More construction in Fort Greene: https://umarelli.org/nyc/brooklyn/fort-greene.md

Every lot on block 2040: https://umarelli.org/nyc/brooklyn/2040.md

## Building permits

- Alteration, filed Jul 20, 2026, estimated cost $349K, described as “Three new apartments are being added to first floor , CO to reflect change”
- Alteration, filed May 6, 2026, estimated cost $100K, described as “Interior alterations to existing commercial medical office to include non-load bearing demo, partition and finishes work. No change to use, occupancy or egress”
- Alteration, filed Apr 24, 2026, estimated cost $192K, described as “Interior alterations of existing commercial medical office to include non-load bearing demo, partition and finishes work. No change to use, occupancy or egress”
- Alteration, filed Apr 15, 2026, estimated cost $50K, described as “To register existing hot water boiler with integral burner at cellar and address violation 000693880J as per plan field herewith. No change in use, egress or cofo.”
- Alteration, filed Mar 25, 2026, estimated cost $10K, described as “Installation of temporary chain link fence as per plans. Chain link fence shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 25, 2026, estimated cost $10K, described as “Installation of temporary chain link fence as per plans. Chain link fence shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 25, 2026, estimated cost $10K, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application”
- Alteration, filed Mar 25, 2026, estimated cost $10K, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application”
- Alteration, filed Dec 3, 2025, described as “Installation of suspended scaffold and material hoist for exterior facade repairs. Suspended scaffold and material hoist shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this…”
- Alteration, filed Dec 3, 2025, described as “Installation of suspended scaffold and material hoist for exterior facade repair & inspections. Suspended scaffold and material hoist shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under…”
- Alteration, filed Sep 4, 2025, estimated cost $99K, described as “Facade restoration as indicated on drawings. There will be no change in the use, egress or occupancy under this application.”
- Alteration, filed Sep 4, 2025, estimated cost $115K, described as “Facade restoration as indicated on drawings. There will be no change in the use, egress or occupancy under this application.”
- Alteration, filed Aug 6, 2025, estimated cost $29K, described as “Installation of temporary pipe scaffold as per plans. Pipe scaffold shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 14, 2025, estimated cost $36K, described as “Facade restoration as indicated on drawings. There will be no change in the use, egress or occupancy under this application.”
- Alteration, filed Nov 15, 2024, estimated cost $15K, described as “Installation of temporary chain link fence as per plans. Chain link fence shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Nov 15, 2024, estimated cost $176K, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 24, 2024, described as “Installation of suspended scaffold and material hoist for exterior facade repairs. Suspended scaffold and material hoist shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this…”
- Alteration, filed Sep 10, 2024, estimated cost $2.7M, described as “Whitman #15, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard rails, roof edge scuppers and leader.…”
- Alteration, filed Sep 10, 2024, estimated cost $2.3M, described as “Whitman #14, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard rails, roof edge scuppers and leader.…”
- Alteration, filed Sep 10, 2024, estimated cost $1.8M, described as “Whitman #13, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard rails, roof edge scuppers and leader.…”
- Alteration, filed Feb 23, 2024, estimated cost $187K, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 7, 2023, estimated cost $5K, described as “Heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 26, 2021, estimated cost $200K, described as “Replacement of plumbing fixtures in existing bathrooms, along with cold, hot water, sanitary & vent piping as shown in drawings. Provide new kitchen appliance with drain and vent line as shown in drawings.”
- Alteration, filed Jul 7, 2020, estimated cost $180K, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed shall comply with chapter 33 of the 2014 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jun 23, 2020, estimated cost $5K, described as “Installation of temporary chain link fence as per plans. Chain link fence shall comply with chapter 33 of the 2014 NYC building code. No change in use, egress or occupancy under this application.”

4 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/3020400001/297-myrtle-avenue.

## Building history

- Alteration, filed Feb 12, 2021, permit issued - entire job/work, units 50 to 53
- Alteration, filed Oct 29, 2020, application processed - entire, units 50 to 53, described as “Removal of exterior concrete stairs and renovation of exist interior spaces and bathrooms”
- Alteration, filed Jul 8, 1997, permit issued - entire job/work, described as “New interior partitions,new doors,new ha ndicapped ramp in existing stor s.new plumbing as shown on plan.new kitc hen equipment.replace existing storefro t.change use to use group 4 community ce nter.create new upper storage deck over…”
- Major Renovation — Conversion, filed Apr 27, 1992, permit issued - entire job/work, 90 units added, 6 stories, described as “Construction new men and women locker facility in existing cellar.work includes erecting masonary partitions, installing new plumbing fixtures and rel ated piping, new floor and wall finishes toilet accessories.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $10,547,550
- Market value (city estimate): $23,439,000
- Taxable value: $0
- Assessed land: $1,030,500
- Assessed improvements: $9,517,050

## Zoning

R6: floor area ratio 1.66 built, 2.43 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
