115 Myrtle Avenue, Brooklyn
Commercial · built 2002 · Block 2047, Lot 40.
Building permits
- Alteration, filed Oct 8, 2026, described as “Installation of suspended scaffold for facade repair & facade inspections. Suspended scaffold shall comply with chapter 33 of the 2022 NYC building code. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 4, 2026, estimated cost $615K, described as “LL11 facade repairs as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 24, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 10, 2023, estimated cost $1K, described as “Installation of pipe scaffolding as indicated on the attached drawings. There are no changes in use, egress or occupancy”
- Alteration, filed Jan 4, 2023, estimated cost $1K, described as “Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- No Work, filed Dec 14, 2022, described as “Tpa request for a christmas party to be held on wednesday, decemeber 21ST of 2022 from 5:30PM until 10:00PM with a maximum occupant load of 225 people, with 3 fireguards circulating.”
- Alteration, filed Oct 18, 2022, estimated cost $117K, described as “Install new duct, demolish existing plenum and tie in existing duct work into new plenum.”
- Alteration, filed Sep 23, 2022, estimated cost $1.3M, described as “Replace roof (6th floor setback) insulation & pavers, install new benches and planters, install new exterior decorative lighting.”
- Alteration, filed Mar 2, 2022, estimated cost $35K, described as “Install new make-up air unit and associated ductwork on partial 1ST floor (naya).”
- Alteration, filed Mar 2, 2022, estimated cost $15K, described as “Sprinkler modifications on partial 1ST floor (naya).”
- Alteration, filed Mar 2, 2022, estimated cost $45K, described as “Rework existing plumbing fixtures for new kitchen equipment.”
- Alteration, filed Mar 1, 2022, estimated cost $85K, described as “Modification of partitions on partial 1ST floor (naya). No change in use egress or occupancy.”
- Alteration, filed Nov 2, 2021, estimated cost $12K, described as “Modification of sprinklers on 1ST floor as per plans filed herewith. No change in use, egress or occupancy. All related work under this application is interior only.”
- Alteration, filed Oct 27, 2021, estimated cost $549K, described as “Interior demolition and installation of partitions on 1ST floor associated with lobby renovation. No change in use, egress or occupancy. All work associated with this application is interior only.”
- Alteration, filed Aug 11, 2021, estimated cost $10K, described as “Modification of sprinklers on 1ST floor as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 11, 2021, estimated cost $139K, described as “Interior demo & installation of partitions on 1ST floor as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 11, 2021, estimated cost $26K, described as “Modification of mechanical on 1ST floor as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 11, 2021, estimated cost $34K, described as “Modification of plumbing fixtures on 1ST floor as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 27, 2021, estimated cost $200K, described as “Removal and installation of partitions on 2ND floor (nys taxation) as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 20, 2021, estimated cost $60K, described as “Modification of ductwork on 2ND floor (nys taxation) as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 20, 2021, estimated cost $11K, described as “Modification of sprinklers on 2ND floor (nys taxation) as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 30, 2021, estimated cost $48K, described as “Removal of ductwork on floors 3,5,6 & 10 as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 30, 2021, estimated cost $70K, described as “Modification of plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 30, 2021, estimated cost $90K, described as “Modification to sprinkler on floors 3,5,6 & 10 as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 29, 2021, estimated cost $676K, described as “Interior demo on floors 3,5,6 & 10 as per plans filed herewith. No change in use, egress or occupancy”
10 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $59,668,200
- Market value (city estimate)
- $132,596,000
- Taxable value
- $0
- Assessed land
- $3,793,500
- Assessed improvements
- $55,874,700
Tax breaks
- ICAP/ICIP exemption, through Jun 30, 2027, about $563,623 a year below the full tax.
Zoning
C6-1A: floor area ratio 16.19 built, above the 6.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Proposed Extension of the Downtown Brooklyn BID (City Planning 2027K0210): Business improvement district, In Public Review, filed Oct 6, 2026. An action to facilitate a merger of 2 Business Improvement Districts (BID) and 1 Special Assessment District (SAD). The merger of the MetroTech Area BID, Court-Livingston-Schermerhorn BID and Fulton Mall SAD in Downtown Brooklyn, Community…
- METROTECH C/G SOUTH (City Planning P2002K0100): Completed, decided Nov 26, 2001. 4TH MOD TO THE LARGE SCALE SPECIAL PERMIT THAT INCORPORATES*THE CHANGES PROPOSED FOR THE HEIGHT & SETBACK, & INCREASES*THE TOTAL NUMBER OF PKG SPACES TO 1623 & THE AMOUNT OF FLOOR*AREA FOR BLDG C/G TO 570,000SF IN THE METROTECH URA;…
- METROTECH C/G SO (City Planning P2002K0099): Completed, decided Nov 26, 2001. 2ND MOD TO THE SPECIAL PERMIT FOR HEIGHT & SETBACK, & PKING;*FOR A CHANGE IN THE DESCRIPTION OF THE APPROVED BLDG FROM*417,615SF TO 570,000SF; ELIMINATION OF ARCADES ON THE WEST &*SOUTH FACADES OF THE BLDG; ADDITION OF UP TO 153…
- METROTECH BLDG C/G SOUTH (City Planning P1998K0362): Completed, decided Jul 23, 1998. 1ST MOD TO THE SPECIAL PERMIT TO REDUCE THE AMOUNT OF PKG*FOR SITE C/G FROM 452 TO 322 SPACES (138 SPACES FOR C/G NO.,*THE NYCFD & UP TO 184 SPACES FOR C/G SO)(POPS); Additional Other #(s): 930492A