4 Metrotech Center, Brooklyn
Commercial · built 1990 · Block 2059, Lot 1.
Building permits
- Alteration, filed Jun 28, 2023, estimated cost $7K, described as “Sprinkler modification of existing tel/data room on part of 7th floor as indicated on attached plans”
- Alteration, filed Jun 28, 2023, estimated cost $74K, described as “Interior renovation of existing tel/data room on part of the 7th floor as indicated on attached plans. DAS space”
- Alteration, filed Apr 12, 2023, estimated cost $86K, described as “Interior renovation of plumbing systems to the 3rd floor related to the wellness center as indicated on attached plans. There is no change in egress, use or occupancy.”
- Alteration, filed Sep 12, 2022, estimated cost $221K, described as “Interior renovation, related to garage ramp, on part of basement level, as indicated on attached plans. There is no change in egress, use or occupancy.”
- Alteration, filed Aug 30, 2022, described as “Installation of temporary construction fence/enclosure per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 16, 2022, estimated cost $7K, described as “Conversion of offices to childcare.”
- Alteration, filed Aug 3, 2022, described as “Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 7, 2022, estimated cost $121K, described as “Construction of mailroom”
- Alteration, filed Mar 31, 2022, estimated cost $98K, described as “Mechanical modification to mailroom.”
- Alteration, filed Mar 31, 2022, estimated cost $15K, described as “Sprinkler modifications in the mailroom.”
- Alteration, filed Mar 25, 2022, estimated cost $650K, described as “Application being filed for structural framing on basement loading dock, 1ST fl mezzanine and roof levels for fuel cell bases. Per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 25, 2022, estimated cost $700K, described as “This application is for the plumbing non potable water, natural gas and nitrogen gas work only. Filled in conjunction with applications B00441868 and B00442582.”
- Alteration, filed Mar 9, 2022, estimated cost $2.1M, described as “Renovation of Willoughby Street entrance”
- Alteration, filed Mar 9, 2022, estimated cost $28K, described as “Mechanical modifications of Willoughby street entrance.”
- Alteration, filed Jan 27, 2022, estimated cost $60K, described as “Interior renovation on part of the 7th floor as indicated on attached plans.”
- Alteration, filed Jan 24, 2022, estimated cost $8K, described as “Sprinkler modifications on part of the 7th floor as indicated on attached plans.”
- Alteration, filed Dec 27, 2021, estimated cost $64K, described as “Interior renovation, related to Sprinkler, Standpipe and Plumbing, on the sub-cellar (tunnel area) and 2nd floor (footbridge area) as indicated on attached plans. There is no change in egress, use or occupancy.”
- Alteration, filed Dec 27, 2021, estimated cost $291K, described as “Interior renovation on the sub-cellar (tunnel area) and 2nd floor (footbridge area) as indicated on the attached plans. There is no change in egress, use or occupancy.”
- Alteration, filed Dec 27, 2021, estimated cost $240K, described as “Interior renovation, related to mechanical systems on the sub-cellar (tunnel area) and 2nd floor (footbridge area) as indicated on attached plans. There is no change in egress, use or occupancy.”
- Alteration, filed Dec 20, 2021, estimated cost $385K, described as “Interior renovation of mechanical systems to the 2nd floor related to the wellness center as indicated on attached plans. There is no change in egress, use or occupancy.”
- Alteration, filed Dec 20, 2021, estimated cost $795K, described as “Interior renovation of mechanical systems to basement level related to child care center as indicated on attached plans. There is no change in egress, use or occupancy.”
- Alteration, filed Dec 20, 2021, estimated cost $894K, described as “Interior renovation on the 2nd floor related to the wellness center as indicated on attached plans. There is no change in egress, use or occupancy”
- Alteration, filed Dec 20, 2021, estimated cost $1.4M, described as “Interior renovation to basement level related to child care center as indicated on attached plans. There is no change in egress, use occupancy.”
- Alteration, filed Dec 17, 2021, estimated cost $434K, described as “Interior renovation of plumbing & sprinkler systems to basement level related to child care center as indicated on attached plans. There is no change in egress, use or occupancy.”
- Alteration, filed Dec 17, 2021, estimated cost $281K, described as “Interior renovation of sprinkler & plumbing systems to the 2nd floor related to the wellness center as indicated on attached plans. There is no change in egress, use or occupancy.”
15 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $107,407,800
- 2026–27 Tax
- $11,459,608
- Market value (city estimate)
- $238,684,000
- Taxable value
- $105,637,980
- Assessed land
- $8,910,000
- Assessed improvements
- $98,497,800
Zoning
C6-4: floor area ratio 13.90 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Proposed Extension of the Downtown Brooklyn BID (City Planning 2027K0210): Business Improvement District, In Public Review, filed Oct 6, 2026. An action to facilitate a merger of 2 Business Improvement Districts (BID) and 1 Special Assessment District (SAD). The merger of the MetroTech Area BID, Court-Livingston-Schermerhorn BID and Fulton Mall SAD in Downtown Brooklyn, Community…
- HRA at 4 Metrotech II (City Planning P2013K0249): Completed, decided Dec 24, 2012. Notice of intent to aquire office space by HRA at 4 Metrotech II in Brooklyn Community District 2.
- HRA at 4 Metrotech (City Planning P2013K0030): Completed, decided Nov 5, 2012. Office lease for HRA IT sections at 4 Metrotech in Downtown Brooklyn
- CHASE FINANCIAL SRVC CNTR/METROTECH (City Planning P1994K0245): Completed, decided Mar 14, 1994. 2ND MODIF TO REDUCE THE NUMBER OF TREES REQUIRED TO BE*PLANTED FROM 64 TO 41 FOR BLDGS E & F & TO SHOW THE LOCATION*OF SIGN PYLON ON GOLD ST & FLATBUSH COURT W/IN METROTECH URA
- CHASE METROTECH BLDG F SIGN (City Planning P1991K0325): Completed, decided Aug 23, 1991. SPECIAL PERMIT TO MODIFY THE SIGN REGS IN A C6-4 DIST FOR*CONST OF ROOF SIGNS AT CHASE FINANCIAL SERV CENTER