# 130 St Edwards Street, Brooklyn

Co-op · 292 units · built 1957 · Block 2068, Lot 1.

On Umarelli: https://umarelli.org/nyc/3020680001/130-st-edwards-street

More construction in Fort Greene: https://umarelli.org/nyc/brooklyn/fort-greene.md

Every lot on block 2068: https://umarelli.org/nyc/brooklyn/2068.md

## Building permits

- Alteration, filed Oct 22, 2025, described as “Installation and use of temporary suspended scaffold for facade inspection. No change to use, egress, or occupancy under this application.”
- Alteration, filed Nov 23, 2023, described as “Suspended scaffold outrigger and material hoist system for exterior facade restoration work.”
- Alteration, filed Apr 6, 2023, estimated cost $5K, described as “Installation of 455' new sidewalk shed at 130 saint edwards st as indicated on plans. There will be no change in the use, egress, or occupancy under this application”
- Alteration, filed Apr 6, 2023, estimated cost $5K, described as “Installation of 430' new sidewalk shed at 135 ashland pl as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jan 28, 2023, estimated cost $5K, described as “Installation of 304' new sidewalk shed at 61 franklin ave as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jan 28, 2023, estimated cost $5K, described as “Installation of 88' new sidewalk shed at 260 myrtle ave, as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jan 28, 2023, estimated cost $5K, described as “Installation of new 355' sidewalk shed at 115 ashaland pl, as indicated on plans. There will be no change in the use, egress, or occupancy under this application”
- Alteration, filed Jan 28, 2023, estimated cost $5K, described as “Installation of 478' new sidewalk shed at 105 ashland pl, as indicated on plans. There will be no change in the use, egress, or occupancy under this application”
- Alteration, filed Apr 25, 2022, estimated cost $99K, described as “Repair/replace facade as necessary to include masonry, parapet reconstruction, shelf angle replacement, pointing, caulking, concrete patching.”
- Alteration, filed Apr 25, 2022, estimated cost $303K, described as “Repair/replace facade as necessary to include masonry, parapet reconstruction, shelf angle replacement, pointing, caulking, concrete patching.”
- Alteration, filed Apr 25, 2022, estimated cost $295K, described as “Repair/replace facade as necessary to include masonry, parapet reconstruction, shelf angle replacement, pointing, caulking, concrete patching.”
- Alteration, filed Apr 25, 2022, estimated cost $303K, described as “Repair/replace facade as necessary to include masonry, parapet reconstruction, shelf angle replacement, pointing, caulking, concrete patching.”
- Alteration, filed Apr 25, 2022, estimated cost $303K, described as “Repair/replace facade as necessary to include masonry, parapet reconstruction, shelf angle replacement, pointing, caulking, concrete patching.”
- Alteration, filed Apr 25, 2022, estimated cost $328K, described as “Repair/replace facade as necessary to include masonry, parapet reconstruction, shelf angle replacement, pointing, caulking, concrete patching. Rain shield over garbage area.”

## Property taxes

- Assessment: $20,088,000
- 2026–27 Tax: $1,790,457
- Market value (city estimate): $44,640,000
- Taxable value: $16,692,594
- Assessed land: $1,026,000
- Assessed improvements: $19,062,000

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $292,338 credit this tax year.
- J-51 Abatement, through Jun 30, 2036, a $1,003 credit this tax year.

## Zoning

R6: floor area ratio 2.47 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 4, 2026: $1,355,000
- Apr 24, 2026: $750,000
- Jan 29, 2026: $561,000
- Jan 5, 2026: $815,000
- Sep 3, 2025: $385,000
- Aug 28, 2025: $1,250,000
- Aug 27, 2025: $490,000
- Aug 7, 2025: $638,000
- Jul 15, 2025: $485,500
- Jul 3, 2025: $650,000

The 10 most recent of 106 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
