371 Flatbush Avenue Ext, Brooklyn
Community facility condominium · built c. 1929 · Block 2085, Lot 7501.
Building permits
- Alteration, filed Jan 8, 2026, estimated cost $50K, described as “Replace existing 10 ton scav unit connectiong to existing duct work, condensate piping, power and controls”
- Alteration, filed Jul 28, 2025, estimated cost $60K, described as “Interior renovation as per plans filed herewith. No chnage to use, egress nor occupancy.”
- Alteration, filed Nov 12, 2024, estimated cost $100K, described as “Filing herewith drawings to remove and replace one (1) new wood water tank and associated piping to existing system. This application do not require a new or amended certificate of occupancy as there is no change in use, exists or…”
- Alteration, filed Sep 30, 2024, described as “Material hoist”
- Alteration, filed May 6, 2024, estimated cost $100K, described as “Install two (2) replacement split ac systems as per plans. No change in use, egress or occupancy.”
- No Work, filed Apr 3, 2024, described as “Tpa request for the brooklyn paramount theater events to be held from 4/20/2024 thru 5/10/2024, various start times, cellar 200 maximum occupant load with 2 fireguards circulating; 1ST floor 2,300 maximum occupant load with 23 fireguards…”
- No Work, filed Mar 18, 2024, described as “Tpa request for the brooklyn paramount theater events to be held from 3/23/2024 thru 3/30/2024, various start times, cellar 200 maximum occupant load with 2 fireguards circulating, 1ST floor 2,300 maximum occupant load with 23 fireguards…”
- Alteration, filed Nov 13, 2023, estimated cost $10K, described as “Installation of temporary scaffold as per plans during general construction work. No change in use, egress or occupancy. Scaffold to comply with chapter 33 of NYC building code.”
- No Work, filed Aug 11, 2023
- No Work, filed Aug 11, 2023
- No Work, filed Aug 11, 2023
- Alteration, filed Jun 29, 2023, estimated cost $5K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 11, 2023, estimated cost $4K, described as “Installation of temporary betamax hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 6, 2023, estimated cost $11K, described as “Installation of temporary work platforms @ multiple levels as per plans during general construction work. No change in use, egress or occupancy. Work platforms to comply with chapter 33 of NYC buidling code.”
- Alteration, filed Mar 22, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- Alteration, filed Feb 1, 2023, estimated cost $10K, described as “Installation of a temporary material hoist as per plans. No change in use, egress or occupancy. Material hoist to comply with NYC building code, chapter 33.”
- Alteration, filed Jan 13, 2023, estimated cost $10K, described as “Installation of temporary scaffold-type work platform as per plans during general construction work. No change in use, egress or occupancy. Work platform to comply with chapter 33 of NYC buidling code.”
- Alteration, filed Nov 23, 2022, estimated cost $25K, described as “Removal of abandoned boiler. no change in use or egress. Existing Oil Tank will be abandoned, The Abandoned process will be filed under different application by Plumber.”
- Alteration, filed Nov 23, 2022, estimated cost $150K, described as “Provide new 2 hot water boilers and associated pumps for future new tenant. No change in use and egress”
- Alteration, filed Nov 2, 2022, estimated cost $300K, described as “Foundation work associated with building renovation filed under alt 1 # 320910010 as per plans filed herewith.”
- Alteration, filed Oct 31, 2022, estimated cost $715K, described as “Sprinkler/ standpipe work as per plans filed herewith.”
- Alteration, filed Oct 14, 2022, estimated cost $5K, described as “Installation of a temporary auditorium scaffold platform system as per plans in conjunction with structural work. No change in use, egress or occupancy. Scaffold to comply with 2014 NYC building code, chapter 33.”
- Alteration, filed Oct 5, 2022, estimated cost $105K, described as “Interior Selected demolition of Floors Cellar - through 6th Floor of paramount theater located at 385 flatbush avenue extension. No change in egress use or occupancy.”
- Alteration, filed Sep 8, 2022, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the 2014 code no change in use, egress or occupancy under this application.”
- Alteration, filed Sep 8, 2022, estimated cost $5K, described as “Installation of temporary plywood fence as per plans. No change in use, egress or occupancy.”
5 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $40,509,450
- 2026–27 tax
- $1,838,284
- Market value (city estimate)
- $90,021,000
- Taxable value
- $16,945,830
- Assessed land
- $6,860,700
- Assessed improvements
- $33,648,750
- Condo units with their own tax lots
- 2
Tax breaks
- Nonprofit exemption (college or university), with no end date, about $2,492,935 a year below the full tax.
Zoning
C6-4: floor area ratio 5.30 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.