# 180 Ashland Place, Brooklyn

Apartment building · 569 units · built 2023 · Block 2095, Lot 26.

On Umarelli: https://umarelli.org/nyc/3020950026/180-ashland-place

More construction in Fort Greene: https://umarelli.org/nyc/brooklyn/fort-greene.md

## Building permits

- Alteration, filed Dec 15, 2025, estimated cost $1K, described as “Hereby filing to install a 20' curb cut on the DeKalb Ave inconjuction with NB#321590113 as shown on plans filed herewith.”
- Alteration, filed Sep 18, 2025, estimated cost $1K, described as “Installation of scaffold stair tower in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Sep 11, 2025, estimated cost $1K, described as “Installation of roof protection for adjacent property protection & overhead protection during construction in accordance with nycc 2022 chapter 33 buliding code. No change in egress, use, or occupancy.”
- Alteration, filed Aug 28, 2025, estimated cost $25K, described as “Installation of overhead protection as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Aug 13, 2025, estimated cost $25K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 25, 2025, estimated cost $9K, described as “Installation of pipe scaffolding as per plans. Pipe scaffolding shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 30, 2024, estimated cost $5K, described as “Filing herewith for installation of Boilers. Filed in conjunction with NB 321590113”
- Alteration, filed Aug 29, 2024, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Jul 12, 2024, estimated cost $100K, described as “Hereby filing support of excavation work including steel pipe solider piles with timber lagging and bracing for installation of con-ed vaults as shown on drawing filed herewith. NO change to use, occupancy or egress.”
- Alteration, filed May 31, 2024, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use or occupancy.”
- Alteration, filed Dec 12, 2023, estimated cost $1K, described as “Installation and use of temporary mobile equipment as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 12, 2023, estimated cost $1K, described as “Installation and use of temporary mobile equipment as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 13, 2023, estimated cost $1K, described as “Installation and use of temporary standing stair tower as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 5, 2023, estimated cost $1K, described as “Installation and use of temporary exterior climbing stair tower as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 24, 2023, estimated cost $1K, described as “Installation & use of temporary loading platforms during new building construction”
- Alteration, filed Aug 7, 2023, estimated cost $10K, described as “Installation of temporary fence as per plans in conjunction with NB construction. No change in use, egress or occupancy. Construction fence to comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Aug 3, 2023, estimated cost $10K, described as “Installation of a heavy duty sidewalk shed as per plans in conjunction with NB construction. No change in use, egress or occupancy. Sidewalk shed to comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Jul 27, 2023, estimated cost $1K, described as “Installation and use of temporary exterior climbing platforms as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jul 20, 2023, estimated cost $1K, described as “Installation & use of concrete placement boom”
- Alteration, filed Jul 12, 2023, estimated cost $30K, described as “Installation of a temporary p/m hoist complex as per plans in conjunction with NB construction. No change in use, egress or occupancy. Hoist complex installed in accordance with 2022 NYC building code, chapter 33.”
- Alteration, filed Oct 27, 2022, estimated cost $1K, described as “Hereby filing to install base building sprinkler and standpipe system in conjunction with NB#321590113 as shown on plans filed herewith. No change to use, occupancy or egress.”
- Alteration, filed Jul 27, 2022, estimated cost $7K, described as “Installation of wood construction fence. There will be no change to egress, use or occupancy.”
- Alteration, filed Jun 17, 2022, estimated cost $1K, described as “Hereby filing to install new plumbing fixtures and related piping for NB#321590113 as shown on plans filed herewith.”
- Alteration, filed Apr 4, 2022, estimated cost $5K, described as “Installation of temporary cantilevered platform as per drawings. Cantilevered platform shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Feb 9, 2022, estimated cost $1K, described as “Hereby filing to install temp standpipe in conjunction with NB# 321590113 as shown on plans filed herewith. No change to use, occupancy or egress.”

18 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/3020950026/180-ashland-place.

## Property taxes

- Assessment: $59,816,250
- 2026–27 tax: $7,389,942
- Market value (city estimate): $132,925,000
- Taxable value: $59,409,450
- Assessed land: $1,894,500
- Assessed improvements: $57,921,750

## Zoning

C6-4: floor area ratio 21.75 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Apr 16, 2020: $62,000,000, 61,950 sq ft, sold with other lots

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Proposed Extension of the Downtown Brooklyn BID (City Planning 2027K0210): Business improvement district, In Public Review. An action to facilitate a merger of 2 Business Improvement Districts (BID) and 1 Special Assessment District (SAD). The merger of the MetroTech Area BID, Court-Livingston-Schermerhorn BID and Fulton Mall SAD in Downtown Brooklyn, Community…

## In the news

[The Everly Wraps Up Construction at 180 Ashland Place in Fort Greene, Brooklyn](https://newyorkyimby.com/2026/02/the-everly-wraps-up-construction-at-180-ashland-place-in-fort-greene-brooklyn.html), New York YIMBY, Feb 28, 2026.