99 Lafayette Avenue, Brooklyn
Apartment Building · 78 units · built c. 1936 · Block 2100, Lot 76.
Building permits
- Alteration, filed Nov 4, 2026, described as “Installation of temporary suspended scaffold equipment. No changes in the means of egress.”
- Alteration, filed Apr 16, 2026, estimated cost $565K, described as “Facade Restoration Project as per plans filed herewith. No change of use or egress.”
- Alteration, filed Feb 12, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jan 7, 2025, estimated cost $92K, described as “AT&T - Replacement of antennas with removal and installation of RRH units on roof. Removal, retrofit and installation of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use,…”
- Alteration, filed Jun 13, 2022, estimated cost $15K, described as “Replacement and extension of existing gas piping in service of new generator installation filed under DOB application no. B00682022. No change in use, egress, or occupancy.”
- Alteration, filed Jun 13, 2022, estimated cost $76K, described as “Remove (1) existing gas generator on roof with (1) new non-emergency gas installation on existing equipment platform. No change in use, egress, or occupancy.”
- Alteration, filed Jun 13, 2022, estimated cost $50K, described as “Verizon site modifications at roof. New equipment platform extension with (1) new cabinet installation. Replace (12) antennas, (6) rrh units, & (3) ovp. Installation of (2) new microwave dishes.”
- Alteration, filed Aug 20, 2020, estimated cost $20K, described as “Modification of existing AT&T site. Replace 8 antennas on the roof.. Install 4 RRH units on the roof. Replace 1 cabinet and retrofit 1 cabinet on platform on roof.. All in conformance with TPPN 5/98. No change in use, egress, or occupancy”
- Alteration, filed Feb 3, 2020, estimated cost $12K, described as “Modification to at&t site. Install (4) ion-M23 sdars (rrh) and (1) equipment cabinet all with related equipment on roof. All in conformance with tppn 5/98. No change in use, egress or occupancy.”
- Alteration, filed Feb 20, 2018, estimated cost $9K, described as “Modification to existing telecommunications site. Replace antennas with related rrh units and install rrh units on roof. All in conformance with tppn 5/98. No change in use, egress or occupancy.”
- Alteration, filed Feb 8, 2018, estimated cost $81K, described as “Installation of telecommunications antennas, GPS antennas, and equipment platform with rain canopy on roof. All work in conformance with TPPN#5/98. No change in use, egress, or occupancy.”
Building history
- Major Renovation — Conversion, filed Jul 18, 2007, plan exam - disapproved, 78 units added, 10 stories, described as “Application file to propose super's apartment. Change of use, egrees or occupancy.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $6,347,700
- 2026–27 Tax
- $708,591
- Market value (city estimate)
- $14,106,000
- Taxable value
- $5,703,860
- Assessed land
- $198,000
- Assessed improvements
- $6,149,700
Zoning
R6B: floor area ratio 6.53 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.