# 178 Broadway, Brooklyn

Mixed use · 5 units · built c. 1910 · Block 2132, Lot 21.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/3021320021/178-broadway

More construction in Williamsburg: https://umarelli.org/nyc/brooklyn/williamsburg.md

Every lot on block 2132: https://umarelli.org/nyc/brooklyn/2132.md

## Building permits

- Alteration, filed May 28, 2026, estimated cost $192K, described as “Hereby filing interior renovation & mechanical work to existing 4TH floor apartment as per plans. Replacing expired DOB application # 340737279. Plumbing work to be filed under subsequent application. Existing co # 320328114”
- Alteration, filed Apr 13, 2026, estimated cost $192K, described as “Hereby filing interior renovation to existing 3RD floor apartment as per plans. Plumbing & mechanical work to be filed under subsequent application. Existing co # 320328114”
- Alteration, filed Mar 29, 2023, estimated cost $15K, described as “Replacing rooftop condensing units”
- Alteration, filed Nov 19, 2020, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 10, 2020, estimated cost $4K, described as “Replace Bathroom PL Fixtures & New Kitchen PL Fixtures in Conjunction with Alt2 Job#340737279”
- Alteration, filed Jul 29, 2020, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 10, 2020, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 10, 2020, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 2, 2020, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jan 2, 2020, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”

## Property taxes

- Assessment: $2,515,950
- 2026–27 tax: $233,272
- Market value (city estimate): $5,591,000
- Taxable value: $2,150,370
- Assessed land: $107,100
- Assessed improvements: $2,408,850

## Zoning

C4-3 (part of the lot is R6): floor area ratio 4.32 built, above the 3.40 base zoning allows, which bonuses, transfers or older rules can permit.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
