# 188 Marcy Avenue, Brooklyn

Apartment Building · 348 units · built 1963 · Block 2141, Lot 19.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/3021410019/188-marcy-avenue

More construction in Williamsburg: https://umarelli.org/nyc/brooklyn/williamsburg.md

Every lot on block 2141: https://umarelli.org/nyc/brooklyn/2141.md

## Building permits

- Alteration, filed Jun 12, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Dec 15, 2025, estimated cost $10K, described as “Installation of pipe scaffolding as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Nov 18, 2025, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Mar 24, 2025, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Sep 10, 2024, estimated cost $208K, described as “Filing for repairs to the facades. No change to use, occupancy or egress.”
- Alteration, filed Jun 7, 2024, described as “Installation of suspended scaffold for facade inspection/repair.”
- Alteration, filed May 23, 2024, estimated cost $766K, described as “Filing for repairs to the facades. No change to use, occupancy or egress.”
- Alteration, filed Apr 29, 2024, described as “Installation of suspended scaffold during facade inspection/repair with hoist.”
- Alteration, filed Mar 20, 2024, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 19, 2024, estimated cost $4K, described as “Installation of temporary barricade as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 18, 2024, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole”
- Alteration, filed Jan 18, 2024, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole”
- Alteration, filed Jul 12, 2023, estimated cost $1K, described as “Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy”
- Alteration, filed Sep 29, 2021, estimated cost $50K, described as “Hereby filing guard booth for Williams Plaza per plan filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Aug 25, 2021, estimated cost $160K, described as “Hereby filing installation of 5 new boilers and associtedgas piping as shown on drawing filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jul 27, 2021, estimated cost $24K, described as “Installation of Plumbing and Sprinkler System (less than 20 heads) as part of conversion of garage into office space. Filed in conjunction with Job Number 321591719. No change in egress use or occupancy”
- Alteration, filed Jul 27, 2021, estimated cost $25K, described as “Installation of Mechanical System as part of conversion of existing garage to office space. Conversion filed under Alteration 1 321591719 DOC02. No change in egress use or occupancy.”
- Alteration, filed Apr 5, 2021, estimated cost $1K, described as “Installation of temporary working platform as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 16, 2020, estimated cost $20K, described as “Installation of washers/dryers in existing tenant laundry room. Install sprinkler heads off existing standpipe.”
- Alteration, filed May 19, 2020, estimated cost $1K, described as “Installation of sidewalk shed (building 5) in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed May 19, 2020, estimated cost $1K, described as “Installation of sidewalk shed (building 4) in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed May 19, 2020, estimated cost $1K, described as “Installation of sidewalk shed (building 3) in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Mar 19, 2020, estimated cost $600K, described as “Filing herewith plumbing work as per plans. No change in use, egress, or occupancy.”
- Alteration, filed Mar 17, 2020, estimated cost $1K, described as “Installation of sidewalk shed located on building #3 of property in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Mar 16, 2020, estimated cost $1K, described as “Installation of sidewalk shed located on building 5 of property in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”

14 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/3021410019/188-marcy-avenue.

## Building history

- Alteration, filed May 8, 2020, permit issued - entire job/work, described as “Alt-1 to be filed at DOB to remove the parking spaces”
- Alteration, filed May 8, 2020, permit issued - entire job/work, described as “Alt-1 to be filed at DOB to remove the parking spaces”
- Alteration, filed May 8, 2020, permit issued - entire job/work, described as “Filing to remove parking reference listed on certificate of occupancy #189585”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $14,278,050
- Market value (city estimate): $31,729,000
- Taxable value: $0
- Assessed land: $1,075,950
- Assessed improvements: $13,202,100

## Zoning

R6 (part of the lot is C4-3): floor area ratio 2.47 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
