# 312 Broadway, Brooklyn

Condominium · 24 units · built 2019 · Block 2142, Lot 7501.

On Umarelli: https://umarelli.org/nyc/3021427501/312-broadway

More construction in Williamsburg: https://umarelli.org/nyc/brooklyn/williamsburg.md

## Building permits

- Alteration, filed Jan 2, 2025, estimated cost $10K, described as “Installation of a temporary construction fence as per drawings filed herewith”
- Alteration, filed Dec 11, 2024, estimated cost $37K, described as “Sprinkler modifications as per drawings filed herewith (citibank)”
- Alteration, filed Sep 4, 2024, estimated cost $27K, described as “CITIBANK-- Structural floor modifications and framing installation for bank build-out.”
- Alteration, filed Sep 3, 2024, estimated cost $1.9M, described as “CITIBANK-- General construction inclusive of partitions installation for bank build-out as per plans filed. No change in use, egress, or occupancy.”
- Alteration, filed Jul 6, 2022, estimated cost $350K, described as “Interior renovation to the 1st and 2nd floor of an existing six (6) story mixed use building. Renovation includes non load bearing partitions and finishes as per plans. No change in use, egress, or occupancy under this application.”
- Alteration, filed Feb 27, 2020, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Fence to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Nov 13, 2019, estimated cost $22K, described as “Alteration type 3 - construction equipment - sidewalk-shed proposed installation of heavy duty sidewalk shed for new building as per plans. No change in use occupancy or egress under this application. Live LOAD300 per square feet. Sidewalk…”
- Alteration, filed Oct 30, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 12, 2019, estimated cost $5K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Feb 12, 2019, estimated cost $8K, described as “Installation of temporary construction fence as per plans. No change in use, occupancy, or egress under this application.”
- Alteration, filed Feb 12, 2019, estimated cost $18K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Dec 12, 2018, estimated cost $5K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Dec 12, 2018, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Dec 12, 2018, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Sep 7, 2018, estimated cost $1K, described as “Installation of curb cut in conjunction with NB”

## Property taxes

- Assessment: $5,229,000
- 2026–27 tax: $72,302
- Market value (city estimate): $11,620,000
- Taxable value: $1,453,413
- Assessed land: $398,700
- Assessed improvements: $4,830,300
- Condo units with their own tax lots: 4

## Tax breaks

- 421-a exemption, through Jun 30, 2056, about $437,230 a year below the full tax.

## Zoning

PARK.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[302 Broadway Nears Completion in Williamsburg, Brooklyn](https://newyorkyimby.com/2020/07/302-broadway-nears-completion-in-williamsburg-brooklyn.html), New York YIMBY, Jul 27, 2020.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
