96 Wythe Avenue, Brooklyn
Hotel · built 2017 · Block 2295, Lot 21.
Building permits
- Alteration, filed Aug 20, 2026, described as “IRA to assist with Condition Assessment”
- Alteration, filed Feb 25, 2025, described as “Installation of a temporary adt access system on the roof as per plans. No change in use, egress or occupancy under this application. Scaffold to comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Nov 8, 2024, estimated cost $10K, described as “Renovation of interior accessory stairs between Ground/Basement and Cellar Levels. No changes to existing use, egress, or occupancy.”
- Alteration, filed Feb 23, 2024, estimated cost $3K, described as “Erect single face hanging sign on wall. IBL No change of use, egress or occupancy”
- Alteration, filed Jan 5, 2024, estimated cost $50K, described as “ADA Guestroom Improvements, no change in use, egress or occupancy.”
- Alteration, filed Jan 5, 2024, estimated cost $20K, described as “Renovation of exiting meeting room, no change in use, egress or occupancy.”
- Alteration, filed Sep 28, 2023, estimated cost $175K, described as “Construction of existing kitchen renovation, no change in use, egress or occupancy.”
- Alteration, filed Aug 10, 2023, estimated cost $24K, described as “Install non-illuminated advertising sign on wall structure filed under separate application # B00907902 (changeable copy)”
- Alteration, filed Aug 10, 2023, estimated cost $25K, described as “Erect wall structure for advertising sign filed under separate application # B00907894. No change in use, egress or occupancy.”
- Alteration, filed Aug 2, 2023, estimated cost $400, described as “Install exterior illuminated blade sign (arlo )”
- Alteration, filed Aug 2, 2023, estimated cost $3K, described as “Install exterior illuminated wall sign (arlo williamsburg)”
- Alteration, filed May 15, 2023, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- No Work, filed May 10, 2023
- No Work, filed May 10, 2023
- No Work, filed May 10, 2023
- Alteration, filed Mar 17, 2023, estimated cost $273K, described as “Application hereby filed for facade restoration as per plans. No change in use, egress, or occupancy under this application.”
- Alteration, filed Oct 28, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
Property taxes
- Assessment
- $28,270,800
- 2026–27 tax
- $1,769,834
- Market value (city estimate)
- $62,824,000
- Taxable value
- $16,314,840
- Assessed land
- $1,968,750
- Assessed improvements
- $26,302,050
Zoning
M1-2: floor area ratio 3.58 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 17, 2023: $96,000,000