# 215 North 10th Street, Brooklyn

Condominium · 31 units · built 2020 · Block 2299, Lot 7503.

On Umarelli: https://umarelli.org/nyc/3022997503/215-north-10-street

More construction in Williamsburg: https://umarelli.org/nyc/brooklyn/williamsburg.md

## Building permits

- No Work, filed Mar 4, 2025
- Alteration, filed Aug 6, 2024, estimated cost $1K, described as “TUP application filed in conjunction with the NB application 321383551 and the TCO request”
- Alteration, filed May 22, 2024, estimated cost $50K, described as “Use of mechanical equipment including electric bobcat in conjunction with DOB application B00997356. No change to occupancy, use or egress.”
- No Work, filed Feb 27, 2024
- Alteration, filed Feb 22, 2024, estimated cost $1.8M, described as “Installation of interior none bearing partitions and related finishes as per plans filed herewith.”
- Alteration, filed Dec 17, 2020, estimated cost $125K, described as “Installation of shoring from subcellar to 6TH floor to temporarily support column loads to enable demo and replacement of various columns between the 4TH and 5TH floors of the new 6-story building under construction (NB-321383551)”
- Alteration, filed Sep 25, 2020, estimated cost $18K, described as “Install pipe scffolding as per drawings. No change in occupancy or means of egress.”
- Alteration, filed Aug 12, 2020, described as “Installation of temporary fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 23, 2020, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 9, 2020, estimated cost $1K, described as “Install 17.5ft curb cut on North 10th Street as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB # 32138355.”
- Alteration, filed Feb 28, 2019, described as “Installation of fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 19, 2018, estimated cost $1K, described as “Install 13.3 ft curb cut on Roebling Street as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB # 32138355.”
- Alteration, filed Apr 27, 2018, estimated cost $9K, described as “Installation of heavy duty sidewalk shed during building demolition, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 27, 2018, estimated cost $7K, described as “Installation of heavy duty sidewalk shed during building demolition, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 11, 2018, estimated cost $5K, described as “Installation of construction fence as per plans.”
- Alteration, filed Apr 11, 2018, estimated cost $5K, described as “Installation of construction fence as per plans.”

## Property taxes

- Assessment: $10,135,803
- 2026–27 tax: $572,824
- Market value (city estimate): $22,524,001
- Taxable value: $8,834,739
- Assessed land: $810,002
- Assessed improvements: $9,325,801
- Condo units with their own tax lots: 34

## Zoning

M1-2/R6A: floor area ratio 3.93 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 20, 2026: $1,340,000, Apt 4E
- Dec 11, 2025: $2,123,000, Apt 4B
- Aug 13, 2025: $2,945,000, Apt 4F
- Jul 1, 2024: $3,150,000, Apt 6C
- Aug 17, 2023: $695,000, Apt 5I
- Aug 15, 2023: $1,075,000, Apt 4G
- May 2, 2023: $1,390,000, Apt 4A
- Feb 13, 2023: $2,870,000, Apt 6C
- Jan 9, 2023: $989,494, Apt 5J
- Dec 16, 2022: $1,424,277, Apt 5A

The 10 most recent of 35 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.

## Board and land use applications

- Variance or special permit (Board of Standards and Appeals 2018-191-BZ): Variance or special permit, Granted, filed Nov 29, 2018, decided Jan 28, 2020. Special Permit (§73-44) to permit a reduction in the required parking spaces for offices (UG 6B) with an PRC-B1 parking category within a proposed development of a new mixed use residential, office and retail building contrary to ZR…

## In the news

[NX Nears Completion at 215 North 10th Street in Williamsburg, Brooklyn](https://newyorkyimby.com/2022/10/nx-nears-completion-at-215-north-10th-street-in-williamsburg-brooklyn.html), New York YIMBY, Oct 12, 2022.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
