126 Bedford Avenue, Brooklyn
Mixed Use · 5 units · built c. 1910 · Block 2304, Lot 20.
Building permits
- Alteration, filed Jun 18, 2024, estimated cost $1K, described as “Install exterior illuminated wall sign (moonburger)”
- Alteration, filed May 11, 2023, estimated cost $25K, described as “Hood and ductwork in existing kitchen working with commercial kitchen cooking equipment. Install Air Conditioning Systems. No change to egress, use or occupancy.”
- Alteration, filed Mar 7, 2023, estimated cost $56K, described as “Sprinklers work as per plans filed herewith, no change in use, egress and occupancy.”
- Alteration, filed Oct 14, 2021, estimated cost $22K, described as “Installation of new plumbing fixtures and equipment in conjunction with GC#B00596678-I1 as per the drawings filed herein. No change to use, occupancy or egress under this application.”
- Alteration, filed Sep 20, 2021, estimated cost $88K, described as “Interior renovation of existing use group 6 commercial space including the installatino of new countertops, non-load bearing partitions, new storefront, & new floor & wall finishes as per the drawings filed herein. No change in use,…”
- Alteration, filed Apr 30, 2021, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- Alteration, filed Oct 23, 2020, estimated cost $6K, described as “Installation of heavy duty shed as per plans filed herewith, no change in use, egress and occupancy.”
- Alteration, filed May 20, 2020, estimated cost $1K, described as “Installation of temporary plywood construction fence”
- Alteration, filed Mar 12, 2020, estimated cost $49K, described as “Mechanical work to cellar, 1ST floor, 2ND floor, 3RD floor, 4TH floor, and roof of an existing 5-family building with commercial. No change to use, occupancy, egress, or zoning under this application”
- Alteration, filed Jan 23, 2020, estimated cost $52K, described as “Plumbing work on cellar, first, second, third, fourth floors as per plans. No change to use, occupancy, egress under this application.”
Property taxes
- Assessment
- $679,950
- 2026–27 Tax
- $17,841
- Market value (city estimate)
- $1,511,000
- Taxable value
- $143,612
- Assessed land
- $69,300
- Assessed improvements
- $610,650
Zoning
R6A: floor area ratio 2.86 built, 3.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 15, 2019: $4,350,000
Open-market sales since 2016, from the Department of Finance’s sales files.