6 Havemeyer Street, Brooklyn
Apartment building · 13 units · built 2025 · Block 2314, Lot 22.
Building permits
- New Building — Multi-Family, filed Mar 18, 2022, 9 units, 6 stories, described as “6 story mixed used building.”
- Alteration, filed Apr 28, 2025, estimated cost $5K, described as “Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 24, 2025, estimated cost $5K, described as “Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 21, 2025, estimated cost $15K, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 21, 2025, estimated cost $15K, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 31, 2024, estimated cost $1K, described as “Mechanical work type filed in conjunction with NB #B00637089-I1”
- Alteration, filed May 29, 2024, estimated cost $25K, described as “Plumbing work type filed in conjunction with NB #B00637089-I1”
- Alteration, filed May 20, 2024, estimated cost $15K, described as “Soe filed in conjunction with NB #B00637089-I1.”
- Alteration, filed Jul 10, 2023, estimated cost $1K, described as “Support of excavation filed in-conjunction with the NB applciation.”
- Alteration, filed Nov 4, 2022, estimated cost $1K, described as “Foundation application filed in-conjunction with the new building application.”
- Alteration, filed Oct 24, 2022, estimated cost $1K, described as “Structural application filed in-conjunction with the new building application. Structural work includes the construction of a new (5) story steel and concrete structure. Foundations will consist of a new deep micro piles supported by…”
- Alteration, filed Nov 29, 2021, estimated cost $1K, described as “Install approximately 240 LF of Construction Wood Fence for construction of new building. No change in egress, use and occupancy.”
- Alteration, filed Jul 10, 2019, estimated cost $1K, described as “Extension of the existing curb cut on havemeyer street in distance 87'-6" from nw corner of havemeyer street and north 9 street. Total width of cc 12' with two (2) 1'-6" splays included.”
- Alteration, filed Mar 22, 2018, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
Property taxes
- Assessment
- $179,550
- 2026–27 tax
- $18,893
- Market value (city estimate)
- $399,000
- Taxable value
- $151,886
- Assessed land
- $179,550
Zoning
M1-2/R6A: floor area ratio 5.11 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.
Recent sales
- Apr 17, 2024: $3,832,627, sold with other lots
- Mar 20, 2017: $1,890,000, sold with other lots
Open-market sales since 2016, from the Department of Finance’s sales files.