# 144 North 8th Street, Brooklyn

Condominium · 41 units · built 2009 · Block 2319, Lot 7501.

On Umarelli: https://umarelli.org/nyc/3023197501/144-north-8-street

More construction in Williamsburg: https://umarelli.org/nyc/brooklyn/williamsburg.md

Every lot on block 2319: https://umarelli.org/nyc/brooklyn/2319.md

## Building permits

- Alteration, filed Aug 25, 2026, estimated cost $437K, described as “Interior renovation of existing eating & drinking establishment including new floor & wall finishes as per the drawings filed herein. No change to the use, occupancy or egress under this application.”
- Alteration, filed May 22, 2026, estimated cost $6K, described as “File mechanical work at 2ND floor roof of existing mix-use building to remove (2) heat pump unit and associated pipes as per plan. No change in use, egress or occupancy.”
- Alteration, filed Apr 8, 2025, estimated cost $2K, described as “Non-illuminated non-advertising accessory retractable storefront awning - legal use as per certificate of occupancy # 300820841. No change of use, egress or occupancy.”
- Alteration, filed Nov 25, 2024, estimated cost $43K, described as “Interior renovation of an existing commercial space as per the plans filed herewith. No change to the use, egress or occupancy.”
- Alteration, filed Sep 10, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Aug 15, 2024, described as “Facade repair and inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco”
- Alteration, filed Feb 9, 2024, described as “Installation and use of suspended scaffold for facade repair and inspection.”
- Alteration, filed Dec 28, 2022, estimated cost $42K, described as “Replacement of rooftop unit with total capacity of 12 tons. No change to egress, use, or occuapancy.”
- Alteration, filed Sep 15, 2022, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the 2014 code. No change inuse, egress or occupancy under this application.”
- Alteration, filed Jan 12, 2022, estimated cost $168K, described as “Fisp repairs. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $9,270,623
- 2026–27 Tax: $823,441
- Market value (city estimate): $20,601,387
- Taxable value: $6,878,364
- Assessed land: $223,200
- Assessed improvements: $9,047,423
- Condo units with their own tax lots: 44

## Tax breaks

- ICAP/ICIP exemption, through Jun 30, 2032, about $81,051 a year below the full tax.

## Zoning

R6B: floor area ratio 3.20 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 10, 2026: $1,750,000, Apt 5A
- Aug 7, 2026: $3,300,000, Apt 12A
- Jul 6, 2026: $1,955,000, Apt 4B
- Nov 14, 2025: $1,500,000, Apt 9C
- Nov 13, 2025: $2,150,000, Apt 10B
- Oct 8, 2025: $2,250,000, Unit PKGAR, sold with other lots
- Jun 9, 2025: $1,795,000, Apt 4A
- Apr 2, 2025: $1,690,000, Apt 6A
- Jan 23, 2025: $1,770,000, Apt 3C
- Dec 20, 2024: $4,550,000, Apt PH2

The 10 most recent of 28 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Extension to Finish Construction (Board of Standards and Appeals 147-07-BZYII): Extension to Finish Construction, Granted, filed Aug 27, 2009, decided Nov 17, 2009. Extension of time (§11-332) to complete construction of a minor development commenced under the prior R6 (M1-2) district regulations. R6B zoning district.
- Appeal (Board of Standards and Appeals 34-08-A): Appeal, Denied, filed Feb 20, 2008, decided Dec 9, 2008. Appeal seeking to revoke permit and approvals that allow the construction of a sixteen story building in violation of ZR §23-142 and ZR §12-10 which fails to provide adequate open space on the zoning lot to support the Building's floor…
- Extension to Finish Construction (Board of Standards and Appeals 147-07-BZY): Extension to Finish Construction, Granted, filed Jun 5, 2007, decided Dec 11, 2007. Extension of time (11-332) to complete construction of a minor development commenced under the prior R6 (M1-2) district regulations. R6B Zoning District.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology