34 North 7th Street, Brooklyn
Condominium · 205 units · built 2009 · Block 2324, Lot 7502.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Oct 14, 2026, described as “Window Inspection”
- Alteration, filed Jun 15, 2026, estimated cost $375K, described as “Interior renovation of existing two-story townhouse unit TH2, including selective non-structural demolition, new partitions, finishes, millwork, doors, and related general construction work. No change to use, egress, or occupancy. No…”
- Alteration, filed May 10, 2024, estimated cost $5K, described as “Removal of convenience stair. Interior renovation of existing apartment (unit R and S) at the 7th and 8th floor duplex apartment of existing 15-story building as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Sep 16, 2022, estimated cost $20K, described as “Removal of (1) demising partition. Interior renovation to include architectural drawings as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jun 16, 2022, estimated cost $25K, described as “Interior renovation of apt P11. Partition changes to non-load-bearing walls as per plans. No change in use, occupancy, or egress.”
- Alteration, filed Jul 28, 2021, estimated cost $4K, described as “Erect illuminated, accessory business channel letter wall sign-b @kent avenue elevation, no change to use, egress or occupation”
- Alteration, filed Jul 28, 2021, estimated cost $4K, described as “Erect illuminated, accessory business channel letter wall sign-a @north 7 street elevation, no change to use, egress or occupation”
- Alteration, filed Jul 10, 2021, estimated cost $26K, described as “Cosmetic renovation of apartment 5V on the 5TH and 6TH floor, including new kitchen cabinets,upgrade bathroom finishes and miscellaneus millwork. Plumbing work. No change in use, egress and/or occupancy.”
- Alteration, filed Jun 26, 2020, estimated cost $5K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Dec 30, 2019, estimated cost $5K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Oct 16, 2018, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
Building history
- Alteration, filed Mar 24, 2016, permit issued - entire job/work, described as “This is to change the number occupants in the day care facility on the 1ST floor. Filed in conjunction with application #321171762”
- New Building — Mid-Rise, filed Apr 11, 2006, signed off Jun 1, 2023, 205 units, 15 stories
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $31,139,599
- 2026–27 Tax
- $13,163
- Assessed land
- $403,069
- Assessed improvements
- $30,736,530
Tax breaks
- 421-a exemption, through Jun 30, 2036, about $9,152,252 a year below the full tax.
Zoning
R6 (part of the lot is R8): floor area ratio 3.51 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 26, 2026: $25,000, Apt 98
- Aug 12, 2026: $1,900,000, Apt 10F
- Jul 16, 2026: $3,180,000, Apt PH1E
- Jul 2, 2026: $2,695,000, Apt 3V
- Apr 27, 2026: $500,000, Apt 61
- Dec 19, 2025: $1,389,000, Apt 8P
- Nov 17, 2025: $1,090,000, Apt 7D
- Jun 20, 2025: $1,125,000, Apt 3E
- Mar 27, 2025: $2,915,000, Apt PH2B
- Mar 11, 2025: $4,750,000, Apt 7T, sold with other lots
The 10 most recent of 159 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Williamsburg Edge Phase 2 Waterfront Certification (City Planning P2014K0254): Completed, decided May 22, 2014. Private application for a design change and phasing certifications for waterfront public access related to development on Parcel 25 in Brooklyn Community District 1's Waterfront Access Plan.
- THE EDGE (City Planning P2011K0055): Completed, decided Apr 5, 2012. CERT THAT NO WATERFRONT PUBLIC ACCESS OR VISUAL CORRIDORS*ARE REQUIRED TO DEV PARCEL FOR RESIDENTIAL & RETAIL USES