# 161 Wythe Avenue, Brooklyn

Commercial · built 1945 · Block 2326, Lot 1.

On Umarelli: https://umarelli.org/nyc/3023260001/75-north-6-street

More construction in Williamsburg: https://umarelli.org/nyc/brooklyn/williamsburg.md

Every lot on block 2326: https://umarelli.org/nyc/brooklyn/2326.md

## Building permits

- Alteration, filed Oct 27, 2022, estimated cost $45K, described as “Mechanical work as per plans filed herewith. No change in use, egress and occupancy.”
- Alteration, filed Aug 1, 2022, estimated cost $17K, described as “Install plumbing fixtures to accommodate new tenant layout for Glossier. No change in egress, use or occupancy”
- Alteration, filed Aug 1, 2022, estimated cost $48K, described as “Mechanical work associated with tenant build out for Glossier in an existing commercial space. HVAC units furnished and installed by landlord. No change in egress, use or occupancy.”
- Alteration, filed Jul 31, 2022, estimated cost $111K, described as “New tenant build out for Glossier in existing retail space. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures. Minor modification to existing storefront. No change in egress, use or occupancy”
- Alteration, filed Mar 9, 2022, estimated cost $36K, described as “Plumbing work as per plans filed herewith, no change in use, egress and occupancy.”
- Alteration, filed Sep 9, 2021, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300 psf”
- Alteration, filed Aug 6, 2021, estimated cost $24K, described as “Application filed herewith as per plans.”
- Alteration, filed Jul 29, 2021, estimated cost $11K, described as “Job filed to show the support of excavation for the foundation and earth work in conjunction with the excavation work for the extension filed under JOB#B00532999.”
- Major Renovation, filed Jun 11, 2021, estimated cost $779K, 2 stories, described as “Alterations to an existing building consisting of facade work, reconfigured floor levels, enlarged bulk with a new stair and new and relocated partitions. Application filed for a new certificate of occupancy.”
- Alteration, filed Mar 24, 2021, estimated cost $17K, described as “Work to the floos 01 - 03 of an existing 3-story commercial building. Alterations to consist of plumbing of fixture removal. No change to zoning, use, egress or occupancy under this application.”
- Alteration, filed Feb 4, 2021, estimated cost $15K, described as “Interior demolition work to an existing 3 story + cellar commercial building. No change in use, egress, or occupancy under this application.”
- Alteration, filed Oct 19, 2020, estimated cost $1K, described as “Installation of plywood construction fence. No change in use, zoning, egress or occupancy proposed under this application”

## Building history

- Alteration, filed Aug 20, 2020, permit issued - entire job/work, stories 3 to 2
- Alteration, filed Oct 3, 2007, signed off Mar 31, 2009, described as “To amend existing c. Of o # 302141965AND reduce # of occupants of existing eating &amp; drinking establishmentu.g. #6 all as per plans filed herewith.”
- Alteration, filed Apr 17, 2006, signed off Aug 30, 2007, described as “Pproposed new eating and drinking establishment u.g. #6. All as per plan s filed herewith.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $697,500
- 2026–27 Tax: $50,458
- Market value (city estimate): $1,550,000
- Taxable value: $675,360
- Assessed land: $68,400
- Assessed improvements: $629,100

## Tax breaks

- ICAP Abatement, through Jun 30, 2049, a $22,879 credit this tax year.

## Zoning

M1-2/R6A: floor area ratio 1.98 built, 3.00 allowed by base zoning.

## Recent sales

- Sep 14, 2023: $11,400,000
- Dec 11, 2019: $6,300,000
- Dec 6, 2016: $3,600,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology