60 North 6th Street, Brooklyn
Commercial · built c. 1920 · Block 2333, Lot 11.
Building permits
- Alteration, filed Feb 13, 2023, estimated cost $27K, described as “Sprinkler modifications to accommodate THE BODEGA 2.0 RENOVATION IN THE EXISTING BUILDING.”
- Alteration, filed Feb 7, 2023, estimated cost $250, described as “Install illuminated double faced blade sign on wall (brilliant earth)”
- Alteration, filed Feb 7, 2023, estimated cost $450, described as “Install illuminated wall sign (brilliant earth)”
- Alteration, filed Nov 23, 2022, estimated cost $332K, described as “Modifications to interior partitions and finishes to accommodate the bodega 2.0 renovation in the existing building.”
- Alteration, filed Nov 22, 2022, estimated cost $168K, described as “HVAC modifications to accommodate the bodega 2.0 renovation in the existing building.”
- Alteration, filed Aug 22, 2022, estimated cost $1K, described as “No work - Application to update 1st & 2nd floor use/occupancy information as per plans. Note: Both floors were previously built-out under BIS Job# 320910261 in compliance with egress & plumbing fixture requirements for proposed occupant…”
- Alteration, filed Jun 17, 2022, estimated cost $50K, described as “Structural modifications for concrete leveling, ramp and railing installations for retail renovation.”
- Alteration, filed Jun 17, 2022, estimated cost $17K, described as “Installation of plumbing fixtures for retail renovation.”
- Alteration, filed Jun 17, 2022, estimated cost $365K, described as “General construction inclusive of partitions installation and mechanical duct connections to existing rtu for retail renovation.”
- No Work, filed Oct 26, 2021, described as “Pop up fashion exhibit with fitness demonstrations and receptions with food and beverage.”
- Alteration, filed Oct 12, 2021, estimated cost $10K, described as “Temporary structures for Hermes exhibit. Structures removed at the end of the programing. No changes to existing structures, use or egress.”
- Alteration, filed Sep 27, 2018, estimated cost $26K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Sep 25, 2018, estimated cost $32K, described as “Installation of heavy duty sidewalk shed during building alteration, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Sep 17, 2018, estimated cost $18K, described as “Installation of plywood fence, as per drawings. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
Building history
- Alteration, filed Dec 15, 2017, signed off Sep 10, 2021, described as “Application filed in for changes of use/occupancy on the 1ST floor from 'warehouse' to 'retail' and on the 2ND floor from 'warehouse' to 'office' with related work as per plans submitted herewith.”
- Alteration, filed Oct 24, 2005, permit issued - entire job/work, stories 1 to 2, described as “Convert existing old-code warehouse building into mixed-use residential and commercial use; miscellaneous partition removal and re-configuration; misc. plumbing installation for new Kitchen and Baths; change to occupancy/use, egress and…”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $1,628,100
- 2026–27 Tax
- $94,433
- Market value (city estimate)
- $3,618,000
- Taxable value
- $1,449,012
- Assessed land
- $540,000
- Assessed improvements
- $1,088,100
Tax breaks
- ICAP Abatement, through Jun 30, 2045, a $62,756 credit this tax year.
Zoning
M1-2/R6A: floor area ratio 2.00 built, 3.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Feb 28, 2022: $25,000,000
- Dec 5, 2017: $19,825,000
Open-market sales since 2016, from the Department of Finance’s sales files.