92 North 6th Street, Brooklyn
Commercial · built c. 1920 · Block 2334, Lot 11.
Building permits
- Alteration, filed Nov 20, 2026, estimated cost $368K, described as “Support-of-excavation for new proposed sidewalk vault.”
- Alteration, filed Apr 14, 2026, estimated cost $2K, described as “Construction fence as per drawings. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Dot permits by others for fence installed on sidewalk/roadway.”
- Alteration, filed Feb 3, 2026, estimated cost $200K, described as “General construction alterations on the 1st thru 3rd floors, cellar, mezzanine, and roof level in conjunction with proposed full building renovation; related work as per plans. No proposed change to building use, egress, or occupancy.”
- Alteration, filed Dec 29, 2025, estimated cost $300K, described as “General construction alterations on the 1st thru 3rd floors, cellar, mezzanine, and roof levels in conjunction with proposed full building renovation; related work as per plans. No proposed change to building use, egress, or occupancy.”
- Alteration, filed Dec 3, 2025, estimated cost $50K, described as “Support of excavation in conjunction with full building renovation & tenant fit-out; related work as per plans.”
- Alteration, filed Nov 21, 2025, estimated cost $500K, described as “Structural & foundation alterations on the 1st thru 3rd floors, cellar, mezzanine, and roof levels in conjunction with full building renovation; related work as per plans. No proposed change in building use, egress, or occupancy.”
- Alteration, filed Nov 21, 2025, estimated cost $400K, described as “Structural alterations on the 1st thru 3rd floors, cellar, mezzanine, and roof levels for proposed partial demolition of existing structural elements; related work as per plans. No proposed change in building use, egress, or occupancy.”
- Alteration, filed Sep 16, 2025, estimated cost $785K, described as “General construction alterations on the 1st thru 3rd floors, cellar, and roof levels for proposed change of use/occupancy; related work as per plans.”
- Alteration, filed Jun 27, 2025, estimated cost $15K, described as “Support-of-excavation for new elevator pit.”
- Alteration, filed Nov 7, 2024, estimated cost $200K, described as “8874- Here with filing to renovate existing U.G. 6 space as per plans. Work includes Painting, installation of Fixtures & millwork, minor non bearing partition work, Floor coverings etc. No change in egress use or occupancy. Pro cert…”
- Alteration, filed Oct 11, 2023, estimated cost $200, described as “Erect accessory business wall sign for cos, no change in use, egress or occupancy.”
- Alteration, filed Sep 5, 2023, estimated cost $300K, described as “8809 - Here with filing to renovate existing U.G. 6 space as per plans. Work includes Painting, installation of Fixtures & millwork, minor non bearing partition work etc. No change in egress use group or occupancy. Professional…”
- Alteration, filed Oct 4, 2022, estimated cost $330K, described as “8702 - Here with filing to build out use group 6 space as per plans. No change in egress use group or occupancy. Professional certification requested.”
- Alteration, filed Aug 16, 2022, estimated cost $200K, described as “General construction alterations on the 1st thru 2nd floors, cellar, and building facade for interior demolition, whitebox construction, and window replacements; related work as per plans. No proposed change in building use, egress, or…”
- No Work, filed Oct 8, 2021
- Alteration, filed Nov 21, 2019, estimated cost $675, described as “Install non-illuminated d/f banner sign on wall (urban outfitters)”
- Alteration, filed Nov 21, 2019, estimated cost $675, described as “Install non-illuminated d/f banner sign on wall (urban outfitters)”
- Alteration, filed Apr 17, 2018, estimated cost $1K, described as “Install 2 non-illumited , double-faced, accessory bussiness signs on exterior wall. Wording: aland( logo)”
Building history
- Alteration, filed Jun 28, 2016, signed off Oct 8, 2019, described as “Alteration type one application to convert commercial building into mercantile consisting of general construction. Structural application filed separately DOB #321411361. Mechanical and plumbing filed separetely DOB#321410497”
- Alteration, filed Mar 11, 2013, signed off Oct 14, 2014
- Alteration, filed Nov 26, 2012, plan exam - in process, described as “No work application filed in conjunction with tax lot subdivision application #320560969 (zoning lot meets and bounds to remain unchanged)”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $1,834,200
- 2026–27 Tax
- $82,228
- Market value (city estimate)
- $4,076,000
- Taxable value
- $1,654,450
- Assessed land
- $166,500
- Assessed improvements
- $1,667,700
Tax breaks
- ICAP Abatement, through Jun 30, 2044, a $97,247 credit this tax year.
Zoning
M1-2/R6A: floor area ratio 3.42 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Oct 30, 2024: $17,000,000
Open-market sales since 2016, from the Department of Finance’s sales files.