# 186 North 6th Street, Brooklyn

Apartment Building · 40 units · built c. 1920 · Block 2336, Lot 18.

On Umarelli: https://umarelli.org/nyc/3023360018/186-north-6-street

More construction in Williamsburg: https://umarelli.org/nyc/brooklyn/williamsburg.md

Every lot on block 2336: https://umarelli.org/nyc/brooklyn/2336.md

## Building permits

- Alteration, filed Aug 5, 2021, estimated cost $128K, described as “Proposed assembly & placement of three (3) temporary classrooms of prefabricated modular non-mobile construction filed in tandem with separate temporary structure / temporary use application (tup # 14/21) filed with bkln DOB bc office”
- Alteration, filed Jun 22, 2020, estimated cost $42K, described as “Mh work type is herewith filed in conj. with dob alt1 # 322029210, for Daikin air-conditioning system (heating and cooling)-one outdoor unit on roof with 26 indoor units for the apartments; ventilation and duct work for the kitchens and…”
- Alteration, filed Apr 29, 2020, estimated cost $10K, described as “Alteration type 3 - construction equipment - scaffold proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Mar 10, 2020, estimated cost $33K, described as “Plumbing work is hereby filed in conj. with dob# 322029210”
- Alteration, filed Mar 6, 2020, estimated cost $5K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Aug 7, 2019, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Aug 7, 2019, estimated cost $5K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jun 19, 2019, estimated cost $5K, described as “Installation of temporary construction fence minimum 8' high, maximum 3' from property line. No change to Use, Occupancy or Egress”
- Alteration, filed Apr 23, 2019, estimated cost $1K, described as “Curb Cut”
- Alteration, filed Oct 29, 2018, described as “Installation of temporary construction fence. No change to use occupancy or egress.”

## Building history

- Alteration, filed Jan 15, 2020, signed off Jan 13, 2021, units 7 to 4, described as “Renovation of existing 3-story &amp; basement brick building, converting 7 dwelling units to 4 dwelling units. Partition work as per plan. No change in bulk, occupancy of use.”
- Major Renovation — Conversion, filed Feb 5, 2018, signed off Nov 2, 2022, 36 units added, 6 stories

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $9,386,100
- 2026–27 Tax: $693,850
- Market value (city estimate): $20,858,000
- Taxable value: $5,578,020
- Assessed land: $675,000
- Assessed improvements: $8,711,100

## Zoning

R6B: floor area ratio 2.20 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
