# 270 Kent Street, Brooklyn

Park · built c. 1884 · Block 2414, Lot 1.

On Umarelli: https://umarelli.org/nyc/3024140001/270-kent-street

More construction in Williamsburg: https://umarelli.org/nyc/brooklyn/williamsburg.md

Every lot on block 2414: https://umarelli.org/nyc/brooklyn/2414.md

## Building permits

- Alteration, filed May 26, 2026, estimated cost $5K, described as “Temporary Installations to be used on a temporary event " Ouai". All the Installations are to be removed upon completion of the event,.”
- No Work, filed Jan 29, 2026, described as “Culture of Bathing is a winter sauna festival that brings bathing culture, contemporary art, and public programming to Domino Parks waterfront.”
- Alteration, filed Jan 22, 2026, estimated cost $10K, described as “Temporary structures for the Culture of Bathing event. Removed at the end of the programing. No changes to existing structures, use or egress.”
- Alteration, filed Nov 12, 2025, estimated cost $5K, described as “Temporary Installations to be used on a temporary event " Target Wonder summit". The Installations are to be removed upon completion of the event.”
- Alteration, filed Apr 24, 2019, estimated cost $1K, described as “Installation of bulkhead scaffold in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed May 21, 2018, described as “Installation of fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 10, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”

## Building history

- Demolition, filed Jul 24, 2017, signed off Aug 21, 2017, stories 7 to 0, described as “No work application. Application filed for administrative purposes only. Work was completed under 320831873”
- Demolition, filed Jul 24, 2017, signed off Aug 21, 2017, stories 2 to 0, described as “No work application. Application filed for administrative purposes only. Work was completed under 320899701”
- New Building — Non-residential, filed May 26, 2017, plan exam - approved, 1 story, described as “Construction of subgrade accessory utility vault building to be reviewed under nycbc 2008”
- New Building — High-Rise, filed May 30, 2014, permit issued - entire job/work, 1,350 units, 52 stories, described as “New mixed-use building. DOB now jobs: pl B01262921-S1, sp/sd B01270573-I1”
- Demolition, filed May 29, 2014, signed off Dec 17, 2014, stories 2 to 0, described as “Raw sugar factory- 2 story buikding mechanical demo requested- bin # 3832104”
- Demolition, filed Aug 20, 2013, signed off Jun 10, 2015, stories 7 to 0, described as “Demolition of multiple attched buildings. Phase iii job filed under bin# 3335798. Mechanical request”
- Demolition, filed Aug 6, 2013, signed off Jan 5, 2015, stories 11 to 0, described as “Demolition of multiple buildings that are connected to each other. Phase ii of domino sugar factory. Mechanical means requested”
- Demolition, filed Jul 29, 2013, signed off Dec 17, 2014, units 10 to 0, stories 2 to 0, described as “Demolition of 2 story building. Mechanical demolition requested. This job is phase 1 filed under bin # 3335797”
- Alteration, filed Feb 1, 2008, plan exam - disapproved, described as “Change of use and enlargement of existing Manufacturing building to mixed use. Application filed in accordance with ZR74-743 as CPC approval is required for this Large Scale development for modifications to bulk and use. Obtain new CO.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $4,299,300
- 2026–27 Tax: $415,360
- Market value (city estimate): $9,554,000
- Taxable value: $3,828,909
- Assessed land: $3,865,500
- Assessed improvements: $433,800

## Zoning

R8 (part of the lot is C6-2): floor area ratio 0.00 built, 6.02 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone VE, high risk from coastal flooding with waves: a 1% chance each year, base flood elevation 14 ft (NAVD88).

## Landmarks

Part of (Former) Havemeyers &amp; Elder Filter, Pan and Finishing House, Later known as the American Sugar Refining Company and the Domino Sugar Corporation (Individual Landmark). 10 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- Domino Site B (City Planning 2024K0344): Zoning Text Change, Special Permit, Completed, filed May 15, 2025, decided Nov 22, 2025. Actions to facilitate the alteration and expansion of the Domino LSGD for Site B, to expand overall footprint, to remove previously approved skybridge, to add balconies, remove a setback, and reduce loading berths to facilitate a new…
- Domino Fourth RD Modification (City Planning 2024K0329): Completed, filed Aug 28, 2024. Two Trees Management is proposing a fourth modification the RD for the approved Large Scale General Development of the Domino Sugar Factory, located in Community District 1, Brooklyn.
- DOMINO SUGAR REFINERY (City Planning P2008K0087): Completed, decided Dec 17, 2007. LANDMARK SITE - LP2268 HAVEMEYERS & ELDER FILTER PAN &\*FINISHING HOUSE, LATER KNOWN AS THE AMERICAN SUGAR REFINERY\*& THE DOMINO SUGAR CORP REFINERY