280 Kent Street, Brooklyn
Other · Block 2414, Lot 3.
Building permits
- Alteration, filed Oct 1, 2026, estimated cost $8K, described as “Installation of temporary worker and contractor shed as per bc 3303.16 and drawings. No change in use, egress and occupancy.”
- Alteration, filed Sep 30, 2026, estimated cost $23K, described as “Installation of temporary worker and contractor shed as per bc 3303.16 and drawings. No change in use, egress and occupancy.”
- Alteration, filed Aug 24, 2026, estimated cost $23K, described as “Installation of temporary overhead protection shed as per plans. Temporary equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Aug 21, 2026, estimated cost $17K, described as “Construction of temporary "construction shanty" as per drawings. No change in use, egress and occupancy.”
- Alteration, filed Jul 6, 2026, estimated cost $5K, described as “Use of mini crane construction equipment as per plans filed herewith”
- Alteration, filed Jun 24, 2026, estimated cost $20K, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress. All work to comply with chapter 33 of nycbc”
- Alteration, filed Jun 23, 2026, estimated cost $1K, described as “Bakers Scaffold perimeter installation and use as per plans filed.”
- Alteration, filed Jun 22, 2026, estimated cost $17K, described as “Construction of temporary "construction shanty" as per drawings. No change in use, egress and occupancy.”
- Alteration, filed Mar 16, 2026, estimated cost $3K, described as “Installation of single climbing-concrete pump at north tower as per plans during construction. Climbing pump shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 10, 2026, estimated cost $3K, described as “Installation and use of temporary loading platform as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 10, 2026, estimated cost $20K, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress. All work to comply with chapter 33 of nycbc”
- Alteration, filed Mar 9, 2026, estimated cost $20K, described as “Installation of 7,000 lb single personnel hoist car (#4) at south as per plans during construction. Hoist shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 6, 2026, estimated cost $3K, described as “Installation and use of temporary interior climbing platforms as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 4, 2026, estimated cost $20K, described as “Installation of 7,100 lb single personnel hoist car (#3) at north as per plans during construction. Hoist shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 4, 2026, estimated cost $20K, described as “Installation of 7,100 lb dual personnel hoist cars (#1 and #2) at north as per plans during construction. Hoist shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Aug 15, 2025, estimated cost $15.0M, described as “Sprinkler and standpipe in conjunction with NB 320917503”
- Alteration, filed Jul 30, 2025, estimated cost $100K, described as “Underground plumbing in conjunction with new building 320917503”
- Alteration, filed Feb 16, 2024, estimated cost $1K, described as “Installation of construction fence.”
- Alteration, filed Aug 31, 2023, estimated cost $5K, described as “Installation of temporary tent, no alt to exist structures for Michael Kors SS24. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion”
- No Work, filed Aug 30, 2023, described as “Seated fashion presentation for the Michael Kors brand. For invited guests only with monitored entry.”
- Alteration, filed Apr 28, 2023, estimated cost $1K, described as “This application is filed for a temporary use permit for construction of three (3) temporary padle tennis courts, platform, steps , ramp and fence enclosures for five (5) months - may 29TH, 2023 thru october 29TH, 2023 pursuant to ac 28-111”
- No Work, filed May 26, 2022, described as “TPA event for Infiniti QX60. Hands-on experience featuring augmented reality, personal photoshoots and VIP guest hospitality. Temporary tent and platform. Max occupancy, 200 persons per day requiring 2 fireguards. 6/11 - 6/12, Domino Park,…”
- Alteration, filed May 26, 2022, estimated cost $20K, described as “INFINITI QX60 Tour NYC. To erect Temporary Tent and install Temporary Platform within an existing site plot (Domino Park - Annex 2, 280 Kent Ave (South 1st Street & River Street)). Scheduled June 9 - 13, 2022. No change in use, egress or…”
- Alteration, filed May 20, 2022, estimated cost $5K, described as “Temporary structure for a "Vitamin Water" inflatable. Installation to be removed upon completion of the event”
- Alteration, filed Apr 30, 2021, estimated cost $5K, described as “Temporary structure application for a temporary DJ booth installation, event scheduled for May 13, 2021 to May 16, 21. All construction shall be removed upon completion of the event.”
Property taxes
- Assessment
- $1,994,850
- 2026–27 tax
- $212,319
- Market value (city estimate)
- $4,433,000
- Taxable value
- $1,957,218
- Assessed land
- $1,994,850
Zoning
R8: floor area ratio 0.00 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Domino Site B (City Planning 2024K0344): Zoning text change, Special permit, Completed, filed May 15, 2025, decided Nov 22, 2025. Actions to facilitate the alteration and expansion of the Domino LSGD for Site B, to expand overall footprint, to remove previously approved skybridge, to add balconies, remove a setback, and reduce loading berths to facilitate a new…
- Domino Fourth RD Modification (City Planning 2024K0329): Completed, filed Aug 28, 2024. Two Trees Management is proposing a fourth modification the RD for the approved Large Scale General Development of the Domino Sugar Factory, located in Community District 1, Brooklyn.
In the news
1,262-Unit Two-Skyscraper Development Rises at 280 Kent Avenue in Williamsburg, Brooklyn, New York YIMBY, Oct 12, 2026.