320 Kent Avenue, Brooklyn
Commercial · built 2022 · Block 2414, Lot 26.
Building permits
- New Building — Non-residential, filed Dec 7, 2021, 1 story, described as “Construction of subgrade utility structure for operations storage, non potable water facility and 1-story retail.”
- Alteration, filed Oct 29, 2026, estimated cost $8K, described as “Temporary and portable saunas at Domino Square for a seasonal program. Removed at the end of the programing. No changes to existing structures, use or egress.”
- Alteration, filed Jul 2, 2026, estimated cost $5K, described as “Temporary recreational climbing wall for Liquid IV and Spider-Man Movie, at Domino Square. Removed at the end of the programing. No changes to existing structures, use or egress.”
- Alteration, filed Oct 27, 2025, estimated cost $20K, described as “Temporary structures for the Domino Square ice Rink, public access. Removed at the end of the programing. No changes to existing structures, use or egress.”
- No Work, filed Sep 10, 2025, described as “Outdoor concert in Domino Square.”
- Alteration, filed Sep 10, 2025, estimated cost $7K, described as “Temporary structures for a concert at Domino Square. Removed at the end of the programing. No changes to existing structures, use or egress.”
- Alteration, filed Dec 9, 2024, estimated cost $1K, described as “Installation of a wastewater treatment and reuse system.”
- Alteration, filed Nov 21, 2024, estimated cost $1K, described as “Installation of non-load bearing partitions and related finished. No change in use, egress or occupancy.”
- Alteration, filed Nov 21, 2024, estimated cost $1K, described as “Installation of non-load bearing partitions and related finished. No change in use, egress or occupancy.”
- Alteration, filed Oct 8, 2024, estimated cost $20K, described as “Temporary structures for the Domino Square ice Rink. Removed at the end of the programing. No changes to existing structures, use or egress.”
- Alteration, filed May 29, 2024, estimated cost $1K, described as “Plumbing work for tenant fit out”
- Alteration, filed May 28, 2024, estimated cost $1K, described as “Plumbing work for tenant fit out on 1st floor.”
- Alteration, filed Dec 18, 2023, estimated cost $1K, described as “Installation of construction fence”
- Alteration, filed Jan 13, 2022, estimated cost $1K, described as “Site grading with excavation not to exceed 5 feet in conjunction w/NB B00629993.”
Property taxes
- Assessment
- $5,096,700
- 2026–27 tax
- $480,377
- Market value (city estimate)
- $11,326,000
- Taxable value
- $4,428,253
- Assessed land
- $2,231,100
- Assessed improvements
- $2,865,600
Zoning
R8: floor area ratio 0.91 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year. FEMA’s preliminary map: zone X, minimal flood hazard.
Board and land use applications
- Domino Site B (City Planning 2024K0344): Zoning text change, Special permit, Completed, filed May 15, 2025, decided Nov 22, 2025. Actions to facilitate the alteration and expansion of the Domino LSGD for Site B, to expand overall footprint, to remove previously approved skybridge, to add balconies, remove a setback, and reduce loading berths to facilitate a new…
- Domino Fourth RD Modification (City Planning 2024K0329): Completed, filed Aug 28, 2024. Two Trees Management is proposing a fourth modification the RD for the approved Large Scale General Development of the Domino Sugar Factory, located in Community District 1, Brooklyn.
- Domino Site D Mod (City Planning 2022K0202): Special permit, Completed, filed Jun 28, 2022, decided Sep 12, 2022. Two Trees Management is proposing a modification to the approved Large Scale General Development of the Domino Sugar Factory. The modification is limited to: Site D (Block 2414 Lot 27) currently approved for the development of a…
In the news
Domino Square Public Plaza Opens on Williamsburg Waterfront, Brownstoner, Sep 23, 2024.