188 South 2nd Street, Brooklyn
Apartment Building · 24 units · built c. 1910 · Block 2419, Lot 12.
Building permits
- Alteration, filed Nov 2, 2026, estimated cost $7K, described as “Install medium duty scaffolding as per plans. Pipe scaffolding shall comply with chapter 33 of the 2022 NYC building code.”
- Alteration, filed Sep 19, 2026, estimated cost $350K, described as “Boiler replacement including ventilation, MER replacement and hot water flow replacement. New insulation of steam piping. No change to use, egress, or occupancy.”
- Alteration, filed May 28, 2026, estimated cost $44K, described as “Installation of 11.44 kw solar energy system on roof. No change of occupancy, use or egress.”
- Alteration, filed Oct 30, 2024, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Oct 7, 2024, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Sep 19, 2024, estimated cost $350K, described as “Boiler replacement including ventilation, MER replacement and hot water flow replacement. New insulation of steam piping.”
- Alteration, filed Sep 13, 2024, estimated cost $352K, described as “Mechanical plans filed herewith to show existing multi-family residential building boiler replacement and heating system maintenanace. No change to use, egress, or occupancy.”
- Alteration, filed Jul 25, 2024, estimated cost $1.1M, described as “Plumbing plans filed herewith to show installation of new heat pump, hot water heater system, and duplex domestic booster pump system.”
- Alteration, filed Jul 18, 2024, estimated cost $495K, described as “Interior and exterior renovations consisting of minor demolition and construction as per plans filed herewith. Structural, mechanical and plumbing filed separately.”
- Alteration, filed Jun 29, 2024, estimated cost $19K, described as “Installation of steel dunnage for installation of new heat pump unit at the main roof as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Sep 22, 2020, estimated cost $3K, described as “Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
Property taxes
- Assessment
- $1,126,800
- Market value (city estimate)
- $2,504,000
- Taxable value
- $0
- Assessed land
- $162,000
- Assessed improvements
- $964,800
Tax breaks
- Article XI exemption, through Jun 30, 2064, about $140,163 a year below the full tax.
Zoning
R6: floor area ratio 5.25 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.