# 1 Eagle Street, Brooklyn

Apartment building · 745 units · built 2020 · Block 2472, Lot 21.

On Umarelli: https://umarelli.org/nyc/3024720021/1-eagle-street

More construction in Greenpoint: https://umarelli.org/nyc/brooklyn/greenpoint.md

## Building permits

- Alteration, filed Feb 12, 2026, estimated cost $65K, described as “The proposed work is limited to interior fitout for an ice cream shop. No change to occupancy group or use group. Occupant load remains consistent with mercantile retail use. No change to exits or egress. Certificate of Occupancy remains…”
- Alteration, filed Feb 14, 2024, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. All equipment shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Apr 17, 2023, estimated cost $295K, described as “File interior layout for daycare lease holder at 001 as per plans filed in conjunction with NB# 321387076, no change in use, egress or occupancy”
- Alteration, filed Nov 15, 2022, estimated cost $2K, described as “Installation of temporary counterweighted suspended scaffold as per drawings during NB const, filed sep. Suspended scaffold shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Nov 1, 2022, estimated cost $2K, described as “Installation of counterweighted temporary suspended scaffold system during new building construction, filed separately. Suspended scaffold shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under this application.”
- No Work, filed Apr 19, 2022
- No Work, filed Apr 19, 2022
- No Work, filed Apr 19, 2022
- No Work, filed Apr 19, 2022
- Alteration, filed Feb 15, 2022, estimated cost $1K, described as “Application filed for a temporary use permit for mechanical room servicing 1 eagle street, 27 eagle street, and 227 west street. Filed in conjunction with NB # 321387021.”
- Alteration, filed Jan 13, 2022, estimated cost $1K, described as “Installation of Sprinkler Loop for Temporary Use of building mechanical room. Filed in conjunction with NB # 321387021”
- Alteration, filed Sep 1, 2021, estimated cost $1K, described as “(1) new doublewall condensing flue. All structural details, supports, gas, etc. Filed under NB 321387147. In conjunction with NB 321387147. No change in means of egress use group or occupancy.”
- Alteration, filed Sep 1, 2021, estimated cost $4K, described as “Install (4) new hot water low pressure gas fired direct vent boilers with integral burners. All structural details, supports, gas, etc. Filed under NB 321387147. No change in means of egress use group or occupancy.”
- Alteration, filed Jul 12, 2021, estimated cost $125K, described as “Use of temporary mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-321387021.”
- Alteration, filed Jul 12, 2021, estimated cost $125K, described as “Use of temporary mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-321387021.”
- Alteration, filed Jun 16, 2021, estimated cost $5K, described as “Installation of a temporary construction fence as per plans in conjunction with NB construction bis# 321387076. No change in use, egress or occupancy. Fence to comply with 2014 NYC building code, chapter 33.”
- Alteration, filed Jun 16, 2021, estimated cost $5K, described as “Installation of a temporary construction fence as per plans in conjunction with NB construction bis# 321387021. No change in use, egress or occupancy. Fence to comply with 2014 NYC building code, chapter 33.”
- Alteration, filed Jun 16, 2021, estimated cost $5K, described as “Installation of a temporary construction fence as per plans in conjunction with NB construction bis# 321387147. No change in use, egress or occupancy. Construction fence shall comply with 2014 NYC building code, chapter 33.”
- Alteration, filed Aug 31, 2020, estimated cost $5K, described as “Installation of a temporary construction fence as per plans in conjunction with NB construction. No change in use, egress or occupancy. Fence to comply with 2014 NYC building code, chapter 33.”
- Alteration, filed May 8, 2020, estimated cost $1K, described as “Application filed for PL associated with civil site work. Work to include install of 13 drains, 1 RPZ, storm and sanitary piping/laterals, 11 manholes, 2 stormwater treatment units. Application filed in conjunction with NB # 321387147.”
- Alteration, filed Dec 17, 2019, estimated cost $1K, described as “Underground piping in compliance with NB #321387076.”
- Alteration, filed Oct 23, 2019, estimated cost $1K, described as “Temporary standpipe work as shown on plans filed herewith in conjunction w/ NB# 321387076”
- Alteration, filed Oct 23, 2019, estimated cost $1K, described as “Temporary standpipe work as shown on plans filed herewith in conjunction w/ NB# 321387147”
- Alteration, filed Oct 23, 2019, estimated cost $1K, described as “Temporary standpipe work as shown on plans filed herewith in conjunction w/ NB# 321387021”
- Alteration, filed Aug 23, 2019, estimated cost $25K, described as “Installation of temporary plywood fence as per plans. Temporary plywood fence shall comply with chapter 2014 NYC building code. No change in use occupancy of egress under this application”

## Property taxes

- Assessment: $90,400,050
- 2026–27 tax: $236,827
- Market value (city estimate): $200,889,000
- Taxable value: $1,903,904
- Assessed land: $4,207,950
- Assessed improvements: $86,192,100

## Tax breaks

- 421-a exemption, through Jun 30, 2057, about $11,008,036 a year below the full tax.

## Zoning

R8: floor area ratio 8.87 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).

## Board and land use applications

- Greenpoint Landing 5B-1/5C-1 Waterfront Updates (City Planning 2019K0398): Certification, Completed, filed Aug 9, 2021, decided Oct 27, 2022. A new waterfront certification and phasing certification for merged zoning lots and letter of substantial compliance to modify approved drawings are being sought by BOP Greenpoint D LLC to facilitate residential, commercial, and waterfront…
- Greenpoint Landing 5B-1 Authorization Renewal (City Planning 2019K0219): Filed, filed Dec 20, 2018. Approval to renew authorizations (ZR 11-42, ZR 11-43) pursuant to ZR Sections 62-822(a) and 62-822(b) is being sought by Brookfield Properties for the site formerly known as Greenpoint Landing Parcel 5B-1 in the Greenpoint neighborhood of…

## In the news

[Eagle + West Waterfront Towers Debut at 1 Eagle Street in Greenpoint, Brooklyn](https://newyorkyimby.com/2022/12/eagle-west-waterfront-towers-debut-at-1-eagle-street-in-greenpoint-brooklyn.html), New York YIMBY, Dec 15, 2022.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
