41 Blue Slip, Brooklyn
Apartment building · 421 units · built 2018 · Block 2472, Lot 50.
Building permits
- Alteration, filed Jul 22, 2025, estimated cost $15K, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress under this application, all work to comply with chapter 33 of nycbc.”
- Alteration, filed May 6, 2025, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Apr 28, 2025, estimated cost $544K, described as “Exterior renovations as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Jul 21, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed May 16, 2023, estimated cost $21K, described as “Installation of new plumbing fixtures and piping as per plans filed no change in use, egress or occupancy.”
- Alteration, filed Mar 9, 2023, estimated cost $50K, described as “Interior renovation of existing ground floor retail space in an existing residential building. No change to occupancy, or egress required.”
- Alteration, filed Nov 15, 2022, estimated cost $90K, described as “Use of temporary suspended scaffold from permanently installed davit system during const operations. Susp. Scaffold shall comply with CH#33 of the NYC bc. No change in use, occupancy or egress under this application. One platform shall be…”
- Alteration, filed Oct 17, 2022, estimated cost $38K, described as “Installation and use of temporary suspended scaffold from davit support system as per plans filed herewith.”
- Alteration, filed Oct 13, 2021, estimated cost $60K, described as “Installation of temporary suspended scaffold per drawings. Cd-5 not required because suspended scaffold will be used during NB const. Suspended scaffold shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under…”
- Alteration, filed Oct 6, 2020, estimated cost $1K, described as “Modification of plumbing system as shown on plans.”
- Alteration, filed Jul 9, 2020, estimated cost $1K, described as “Installation of equipment and ducts as shown on plans”
- Alteration, filed Jul 9, 2020, estimated cost $1K, described as “Relocation, removal and installation of new sprinkler heads and relocation of piping.”
- Alteration, filed May 17, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- No Work, filed Jan 25, 2019
- Alteration, filed Jul 19, 2018, estimated cost $70K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 25, 2018, described as “Sidewalk shed proposed installation of sidewalk shed as per plan no change in use, occupancy of egress under this application.”
Property taxes
- Assessment
- $63,135,000
- 2026–27 tax
- $7,247
- Market value (city estimate)
- $140,300,000
- Taxable value
- $58,260
- Assessed land
- $2,185,200
- Assessed improvements
- $60,949,800
Tax breaks
- 421-a exemption, through Jun 30, 2056, about $7,846,116 a year below the full tax.
Zoning
R8 (part of the lot is R6): floor area ratio 9.23 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
Board and land use applications
- Greenpoint Landing 5A Zoning Lot Subdivision Cert (City Planning 2022K0237): Certification, Completed, filed Dec 22, 2022, decided Aug 1, 2025. A Zoning Certification pursuant to 62-812 to subdivide a zoning lot is being sought by BOP Greenpoint for Greenpoint Landing Parcel 5A in Greenpoint, Community District 1, Brooklyn.