# 19 Clay Street, Brooklyn

Vacant land · Block 2482, Lot 9.

On Umarelli: https://umarelli.org/nyc/3024820009/19-clay-street

More construction in Greenpoint: https://umarelli.org/nyc/brooklyn/greenpoint.md

## Building permits

- New Building — Mid-Rise, filed Sep 17, 2025, 68 units, 14 stories, described as “Proposed 14 story mixed use building.”
- Alteration, filed Jul 1, 2026, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. Pipe scaffolding shall comply with chapter #33 of the NYC building code 2022. No change in use, occupancy, or egress under this application.”
- Alteration, filed Sep 25, 2025, estimated cost $260K, described as “To file for a temorary structure in the open space to do site work. No change in use, occupancy or egress.”
- Alteration, filed Aug 8, 2025, estimated cost $50K, described as “Application is filed for installation of 8'-0" high constructionfence for protection during construction.”
- Alteration, filed Jun 16, 2025, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jun 10, 2025, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans during construction. No change in use, egress or occupancy. Fence to comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed May 28, 2025, estimated cost $570K, described as “Support of Excavation work in conjunction with NB job# B01280400-I1. MPP# 482”
- Demolition, filed Feb 5, 2025, estimated cost $300K, described as “Full demolition of 2 story structure, using hand held and mechanical to assist.”
- No Work, filed Oct 16, 2023
- Alteration, filed Dec 15, 2022, estimated cost $5K, described as “Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 3, 2022, estimated cost $450K, described as “Filing mechanical application in conjunction with general construction application. No change to use, egress or occupancy”
- Alteration, filed Oct 28, 2022, estimated cost $200K, described as “Filing for interior renovation of 1ST and 2ND floor for plumbing and sprinkler work. No change to use egress or occupancy”
- Alteration, filed Sep 13, 2022, estimated cost $5K, described as “Installation of temporary construction plywood fence as per plans. No change in use, egress or occupancy. Fence shall comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Aug 19, 2022, estimated cost $700K, described as “Filing for interior renovation of 1st and 2nd floor as well as installation of new roof membrane and new storefront. No change to use, egress or occupancy.”
- Alteration, filed Aug 8, 2022, estimated cost $50K, described as “The structural details for the proposed window enlargement & 2ND floor reinforcement at the 2-story in conjuction with alt-1 job no. B00804580.”
- Alteration, filed Aug 3, 2022, estimated cost $50K, described as “Filing for interior demolition of 1st and 2nd floor. No change to use, egress or occupancy.”

## Property taxes

- Assessment: $319,950
- 2026–27 tax: $34,708
- Market value (city estimate): $711,000
- Taxable value: $319,950
- Assessed land: $319,950

## Zoning

M1-2/R6: floor area ratio 0.00 built, 2.43 allowed by base zoning.

## Recent sales

- Jun 16, 2022: $15,129,833, sold with other lots

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[Rendering Revealed for 19–29 Clay Street in Greenpoint, Brooklyn](https://newyorkyimby.com/2025/11/rendering-revealed-for-19-29-clay-street-in-greenpoint-brooklyn.html), New York YIMBY, Nov 5, 2025.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology