# 65 Dupont Street, Brooklyn

Apartment building · 206 units · built 2024 · Block 2487, Lot 17.

On Umarelli: https://umarelli.org/nyc/3024870017/65-dupont-street

More construction in Greenpoint: https://umarelli.org/nyc/brooklyn/greenpoint.md

## Building permits

- Alteration, filed Jun 19, 2025, estimated cost $1K, described as “This application is filed for a Temporary Use Permit for a model apartment at 3rd floor pursuant to section AC 28-111 and Buildings Bulletin 2010-002.”
- Alteration, filed Sep 6, 2024, estimated cost $1K, described as “Curb Cut application filed in conjunction with NB 321805828, 12 Feet Wide”
- Alteration, filed Jun 3, 2024, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jan 17, 2024, described as “Installation of suspended scaffold for facade inspection/repair”
- Alteration, filed Oct 19, 2023, estimated cost $10K, described as “Installation of placing boom in conjuction with NB 321805828. This application involves no change in use, occupancy or egress.”
- Alteration, filed Sep 21, 2023, estimated cost $1K, described as “Installation of temporary plywood fence as per plan. No change in use, egress or occupancy.”
- Alteration, filed Sep 19, 2023, estimated cost $20K, described as “Dual 7000 # capacity personnel/material hoists during NB const, filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elevator application submitted separately”
- Alteration, filed Mar 29, 2023, estimated cost $10K, described as “Temporary 8' construction fence, as per plans. Filed in-conjunction with B00846091-I1”
- Alteration, filed Oct 31, 2022, estimated cost $10K, described as “Install LNAPL Physical Barrier wall to comply with NYCDEC / OER requirements”
- Alteration, filed Oct 7, 2022, estimated cost $75K, described as “Propose to erect a tent structure. No change to use, egress or occupancy.”
- Alteration, filed May 23, 2022, estimated cost $25K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around dupont warehouse complex property perimeter on grade to enclose entire site \[lots 57, 17, 72, 78, 1, 10, 12, 18, 20 and 21\] for…”
- Alteration, filed May 19, 2022, estimated cost $25K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around dupont warehouse complex property perimeter on grade to enclose entire site \[lots 57, 17, 72, 78, 1, 10, 12, 18, 20 and 21\] for…”
- Alteration, filed May 19, 2022, estimated cost $25K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around dupont warehouse complex property perimeter on grade to enclose entire site \[lots 57, 17, 72, 78, 1, 10, 12, 18, 20 and 21\] for…”
- Alteration, filed May 19, 2022, estimated cost $25K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around dupont warehouse complex property perimeter on grade to enclose entire site \[lots 57, 17, 72, 78, 1, 10, 12, 18, 20 and 21\] for…”
- Alteration, filed Apr 5, 2022, estimated cost $25K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around dupont warehouse complex property perimeter on grade to enclose entire site \[lots 57, 17, 72, 78, 1, 10, 12, 18, 20 and 21\] for…”
- Alteration, filed Mar 23, 2022, estimated cost $25K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around dupont warehouse complex property perimeter on grade to enclose entire site \[lots 57, 17, 72, 78, 1, 10, 12, 18, 20 and 21\] for…”
- Alteration, filed Mar 22, 2022, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy”
- Alteration, filed Mar 22, 2022, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed is in the roadway and shall be permitted by d.o.t. No change in use, egress or occupancy.”
- Alteration, filed Mar 22, 2022, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 18, 2022, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed is in the roadway and shall be permitted at d.o.t. No change in use, egress or occupancy.”
- Alteration, filed Mar 18, 2022, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed is in the roadway and shall be permitted at d.o.t. No change in use, egress or occupancy.”
- Alteration, filed Mar 18, 2022, described as “Installation of temporary sidewalk shed as per plans. Sidewalk shed is in the roadway and shall be permitted at d.o.t. No change in use, egress or occupancy.”
- Alteration, filed Mar 11, 2022, described as “Installation of temporary sidewalk shed as per plans. Sections of the shed are in the roadway and shall be permitted at d.o.t. No change in use, egress or occupancy.”
- Alteration, filed Mar 11, 2022, described as “Installation of temporary sidewalk shed as per plans. Sections of the shed are in the roadway and shall be permitted at d.o.t. No change in use, egress or occupancy.”
- Alteration, filed Mar 7, 2022, estimated cost $983K, described as “Filed herewith Sprinkler & Standpipe work in-conjunction with New Building 321805828.”

2 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/3024870017/65-dupont-street.

## Property taxes

- Assessment: $21,263,400
- 2026–27 tax: $235,482
- Market value (city estimate): $47,252,000
- Taxable value: $1,893,095
- Assessed land: $2,206,350
- Assessed improvements: $19,057,050

## Tax breaks

- 421-a exemption, through Jun 30, 2061, about $2,409,472 a year below the full tax.

## Zoning

M1-2/R6A: floor area ratio 3.67 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.

## In the news

[Housing Lottery Launches for Greenpoint Central at 65 Dupont Street in Greenpoint, Brooklyn](https://newyorkyimby.com/2025/05/housing-lottery-launches-for-greenpoint-central-at-65-dupont-street-in-greenpoint-brooklyn.html), New York YIMBY, May 10, 2025.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology