- Alteration, filed Apr 25, 2024, estimated cost $1K, described as “This application is filed for a Temporary Use Permit for a sales office and model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002.”
- Alteration, filed Jan 17, 2024, described as “Installation of suspended scaffold for facade inspection/repair”
- Alteration, filed Nov 13, 2023, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 19, 2023, estimated cost $10K, described as “Installation of placing boom in conjuction with NB 321805855. This application involves no change in use, occupancy or egress.”
- Alteration, filed Sep 19, 2023, estimated cost $20K, described as “Dual 7000 # capacity personnel/material hoists during NB const, filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elevator application submitted separately”
- Alteration, filed Sep 12, 2023, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy.”
- Alteration, filed Mar 29, 2023, estimated cost $10K, described as “Temporary 8' construction fence, as per plans. Filed in-conjunction with B00846090-I1”
- Alteration, filed Sep 26, 2022, estimated cost $75K, described as “Propose to erect a tent structure. No change to use, egress or occupancy.”
- Alteration, filed Apr 5, 2022, estimated cost $25K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around dupont warehouse complex property perimeter on grade to enclose entire site [lots 57, 17, 72, 78, 1, 10, 12, 18, 20 and 21] for…”
- Alteration, filed Apr 5, 2022, estimated cost $25K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around dupont warehouse complex property perimeter on grade to enclose entire site [lots 57, 17, 72, 78, 1, 10, 12, 18, 20 and 21] for…”
- Alteration, filed Apr 5, 2022, estimated cost $25K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around dupont warehouse complex property perimeter on grade to enclose entire site [lots 57, 17, 72, 78, 1, 10, 12, 18, 20 and 21] for…”
- Alteration, filed Mar 23, 2022, estimated cost $25K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around dupont warehouse complex property perimeter on grade to enclose entire site [lots 57, 17, 72, 78, 1, 10, 12, 18, 20 and 21] for…”
- Alteration, filed Mar 18, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 16, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 16, 2022, estimated cost $1K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 11, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 7, 2022, estimated cost $947K, described as “Filed herewith Sprinkler & Standpipe work in-conjunction with New Building 321805855.”
- Alteration, filed Mar 1, 2022, estimated cost $1K, described as “Filed herewith Curb Cub in conjunction with NB and BPP applications”
- Alteration, filed Mar 1, 2022, estimated cost $1K, described as “Filed herewith Curb Cub in conjunction with NB and BPP applications”
- Alteration, filed Mar 1, 2022, estimated cost $1K, described as “Filed herewith Curb Cub in conjunction with NB and BPP applications”
- Alteration, filed Feb 7, 2022, estimated cost $10K, described as “Dismantle sprinkler system for Building which includes addresses 278-296 Franklin St, 55-93 Dupont St, 10-32 Clay St-demo #s 322100383, 322100301, 322100347, 322100365, 322100374, 322101122, 322100276, 322100294, 322100285, 322100310,…”
- Alteration, filed Jan 24, 2022, estimated cost $25K, described as “Alteration type 3 - construction equipment - fence: 8'-0" high construction fence to be erected around dupont warehouse complex property perimeter on grade to enclose entire site [lots 57, 17, 72, 78, 1, 10, 12, 18, 20 and 21] for…”
- Alteration, filed Dec 15, 2021, estimated cost $50K, described as “Support of Excavation in conjunction with New Building # 321805855”
Property taxes
- Assessment
- $17,973,000
- 2026–27 tax
- $266,282
- Market value (city estimate)
- $39,940,000
- Taxable value
- $2,140,705
- Assessed land
- $2,204,100
- Assessed improvements
- $15,768,900
Tax breaks
- 421-a exemption, through Jun 30, 2060, about $1,969,379 a year below the full tax.
Zoning
M1-2/R6A (part of the lot is R6B): floor area ratio 3.15 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.